schoolsolarpanels Solar for schools and academy trusts Book a roof survey

Specialist solar panels for schools in Tottenham

What decides a solar scheme at a Tottenham school is how much of the output the site uses itself, not how much the roof makes. We arrange the roof survey, model the output against the school's own half hourly consumption, and set out the funding routes.

25.4% of the modelled year lands in July and August, on a roof that returns 902 kWh per kWp a year. The worked example below runs at 190 kWp, the size applied for at the nearest school scheme on record. Source: EU PVGIS v5.2, SARAH3, 10 degree pitch, 14 percent system loss.

Book a roof survey in Tottenham
playing field 4 1 2 3 no array pending structural assessment 0 40 m N
  1. 1 teaching block
  2. 2 hall and kitchen
  3. 3 sports hall
  4. 4 1960s block, no array
  5. first phase
  6. later phase
Drawing Illustrative Greater London estate
Blocks 4, 3 with array
Array about 345 kWp
Yield about 311,000 kWh/yr
Frontage about 90 m / Rev A / Greater London

Illustrative layout for an estate of this size. The array is drawn at about 345 kWp, roughly 53 percent of the 650 kWp these three roofs would hold, because a school sizes to the load it can use in term time rather than to the roof it has: generation it cannot use is exported at a much lower rate than it pays to import. The hatched block carries no array because its structure has not been assessed, which on a school of that era is the usual starting point rather than an exception. Your own figures, and which of your blocks can take an array, come from the roof survey.

Tottenham / Greater London
A two storey 1970s school block with a shallow pitched roof covered in solar panels, empty playground in front and a playing field beyond
School buildings of the kind we survey across Greater London. Not a named school and not our work.

Solar for education buildings across Greater London

A one kilowatt-peak array on a shallow pitched roof in Tottenham models at 902 kWh a year, from modelled irradiation of 1,161 kWh per square metre in the plane of the array (EU PVGIS v5.2, SARAH3, 10 degree pitch, 14 percent system loss). That is roughly 2 percent above the mean across the towns we cover, so latitude is working slightly in your favour here.

Scaled up, a 190 kWp array, sized to what the nearest school scheme on record applied for, 16 miles away at Welwyn Garden City, models at about 171,400 kWh a year before shading, and needs roughly 564 square metres of clear roof. We take the size from the nearest real application rather than a round number, so the example is anchored to something a planning officer has already seen.

Spread across the year that is about 43,500 kWh landing in July and August and roughly 9,100 kWh across December and January. UK Power Networks sets what may go back onto the network here, so the July figure is the one worth putting in front of a governing body first.

FIG. 1 Tottenham against the rest of Greater London
  • Islington902
  • Marylebone902
  • Mayfair902
  • Merton902
  • Tottenham902
  • Westminster902
  • Wembley901
  • Hampstead900
  • Highgate900

Tottenham ranks 40 of 50 towns we cover in Greater London on modelled yield, against a national mean of 886 kWh per kWp. The county runs from 847 to 987, a spread of 140 kWh per kWp. On a 500 kWp array that is about 70,000 kWh a year between the strongest and weakest town in the county.

Bars are zero based, so length is proportional to the figure. Where a county is flat, that is the finding: latitude is not the lever, the timetable is. Source: EU PVGIS v5.2, modelled per town

School solar on record near Tottenham

There is no school entry for Tottenham and the area around it in the Renewable Energy Planning Database. The register is dependable for anything from a megawatt upward and incomplete below it, and a school array is usually nearer a fifth of a megawatt, so this says more about the threshold than about Tottenham.

Look 16 miles out and there is one: Ridgeway Academy, Herns Lane in Welwyn Garden City, 190 kWp, applied for by Earthpoints Limited, which holds consent and is awaiting construction. None of our doing. It is a public planning record, and the nearest evidence available of how an application like yours is treated around here. Source: Renewable Energy Planning Database, Q1 2026.

Term dates against the Tottenham generation curve

A Tottenham school roof generates most in the weeks its buildings are closed. 25.4 percent of the modelled year lands in July and August alone (EU PVGIS v5.2), and the summer holiday takes roughly six of those nine weeks out of the timetable. June is the strongest single month here at 13.7 percent of the annual total, which is still term time, and that works slightly in your favour against towns whose curve peaks in July.

Winter reverses it. December and January between them return 5.3 percent of the modelled year, and that is when the heating, the lighting and a full register are all drawing at the same time. The roof makes 5.6 times as much in June as it does in December, and August alone outproduces December by about 4.8 to one. 73 percent of the year arrives between April and September, and the point of that figure is not that the summer half goes unused, because April, May and June are full teaching months that draw hard. It is that the concentration peaks in the few weeks at the end of it when the building is shut.

Summed over the year, about 49 percent of what a school roof makes arrives while the school is open. For a business trading every weekday the equivalent is roughly 71 percent. Nothing about Tottenham changes that ratio much, but plenty about your own site changes what to do with it.

The weekly pattern repeats the annual one. Saturdays and Sundays generate as well as any other day and consume almost nothing, so before storage or export is even discussed it is worth knowing what the site does at a weekend, which only half hourly data will tell you.

A Tottenham governing body should read that as a sizing constraint, not a reason to stop. The base load that runs through the holidays, servers, comms, refrigeration, ventilation and hot water, is the floor the array should be built up from, and everything above it has to be justified by storage, export or summer occupancy.

We set out the full treatment of the school year against the generation curve on the home page, and what it does to a payback figure under costs.

FIG. 2 A Tottenham roof against the English school year
0 35 70 105 140 Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec kWh August: nobody in the building
  • generated while the school is open
  • generated at a weekend or in the holidays
The same figures as a table
Monthly output for a 1 kWp array in Tottenham, split by whether the day is a school session day. Across the year 49 percent of generation lands while the school is open.
Month Session days Output, kWh per kWp School open School closed
Jan 20 26 17 9
Feb 15 39 21 18
Mar 21 73 49 24
Apr 12 104 42 62
May 17 119 65 54
Jun 21 124 87 37
Jul 11 124 44 80
Aug 0 105 0 105
Sep 20 83 55 28
Oct 17 52 29 23
Nov 21 31 22 9
Dec 15 22 11 11
Year 190 902 442 460
Each bar is one month's output per kWp, divided at the school gate. The June bar is 5.6 times the December one and the timetable runs the other way round. We apportion a month's generation evenly over its days, having no half hourly data for your meter. Session days follow a typical English school year of 190 days. Your own trust or authority may differ by a few days either way. Source: EU PVGIS v5.2, session days from a typical school calendar

Haringey schools, phase by phase

Haringey has 82 open state-funded schools and colleges on the DfE register teaching 34,836 pupils between them. Source: DfE Get Information About Schools.

The split is 63 primary, 12 secondary, 5 special and 2 further education, at an average of 425 pupils a site. A ratio of 5.3 to one tells you where the roof area is. It is not with the 63 primaries, which mostly offer a hall and a teaching block each, but with the larger sites that were built with a sports hall and a dining block attached.

Where a multi-academy trust holds several of those sites, surveying the estate in one pass beats taking a roof at a time. The design work, the connection applications and the procurement paperwork are the same job repeated, and a trust that runs them together gets a better answer on all three.

Aerial view of a school site with teaching blocks of several different ages, a sports hall and a playing field, solar arrays on two of the flat roofs
A school site with blocks of several ages, which is the usual starting point for a trust estate survey.

Grid connection through UK Power Networks

UK Power Networks operates the distribution network across Greater London, so the export application goes to them. Anything larger than 3.68 kW per phase falls under G99, which means an application before commissioning rather than a notification afterwards. A constrained network is not the end of a scheme. Capping export costs little when the building already absorbs most of what the roof produces.

Book the survey

Book a roof survey at your Tottenham school

A survey in Tottenham starts with three things from you. Give us the postcode, the approximate roof area and, if you can get it from your supplier, twelve months of half hourly readings. What comes back is a usable area figure per block, output modelled against your own load rather than an average, and the ways a Tottenham school can pay for it.

Lenzie Consulting Ltd arranges the survey and passes your details to an MCS-certified installation partner so they can quote. We do not carry out the installation ourselves.

We pass your details to our MCS-certified installation partner so they can quote. Read the privacy notice.

Tottenham school solar, answered

What would a 190 kWp array produce at a Tottenham school?
Yes, and the figure matters more than the sunshine. 902 kWh per kWp a year puts a 190 kWp array at around 171,400 kWh, on roughly 564 square metres of roof. The value of that depends on your term time load. Source: EU PVGIS v5.2, SARAH3, 10 degree pitch, 14 percent system loss.
What happens to the electricity during the summer holidays in Tottenham?
Less is wasted than governors expect, but the figure is worth seeing: 25.4 percent of the year is modelled to arrive in July and August here (EU PVGIS v5.2), against a site running on holiday base load. Lettings, holiday clubs and summer works take some of it, storage takes more, and the rest is an export question for UK Power Networks.
Who do we apply to for export near Tottenham?
Only UK Power Networks can answer it for your connection. What we can say is that a capped export limit rarely breaks a school scheme, because the array that suits a school is sized to the term time load rather than to the roof.
How many schools are there around Tottenham?
Haringey has 82 open state-funded schools and colleges on the DfE register, with 34,836 pupils on roll. Source: DfE Get Information About Schools. We survey across the whole of that area, and where a trust holds several sites we look at them in one pass.

Nearby

All Greater London locations