Specialist solar panels for schools in Brixton

What decides a solar scheme at a Brixton school is how much of the output the site uses itself, not how much the roof makes. We arrange the roof survey, model the output against the school's own half hourly consumption, and set out the funding routes.

326,200 kWh a year, modelled for a 360 kWp array on roughly 1,069 sqm of clear roof. That is the size applied for at the nearest school scheme on record. Source: EU PVGIS v5.2, SARAH3, 10 degree pitch, 14 percent system loss.

Book a roof survey in Brixton
playing field 4 1 2 3 no array pending structural assessment 0 40 m N
  1. 1 teaching block
  2. 2 hall and kitchen
  3. 3 sports hall
  4. 4 1960s block, no array
  5. first phase
  6. later phase
Drawing Illustrative estate, not a Brixton school
Blocks 4, 3 with array
Array about 345 kWp
Yield about 313,000 kWh/yr
Frontage about 90 m / Rev A / Greater London

Illustrative layout for an estate of this size. The array is drawn at about 345 kWp, roughly 53 percent of the 650 kWp these three roofs would hold, because a school sizes to the load it can use in term time rather than to the roof it has: generation it cannot use is exported at a much lower rate than it pays to import. The hatched block carries no array because its structure has not been assessed, which on a school of that era is the usual starting point rather than an exception. Your own figures, and which of your blocks can take an array, come from the roof survey.

Brixton / Greater London
A two storey 1970s school block with a shallow pitched roof covered in solar panels, empty playground in front and a playing field beyond
School buildings of the kind we survey across Greater London. Not a named school and not our work.

Solar for education buildings across Greater London

A one kilowatt-peak array on a shallow pitched roof in Brixton models at 906 kWh a year, from modelled irradiation of 1,163 kWh per square metre in the plane of the array (EU PVGIS v5.2, SARAH3, 10 degree pitch, 14 percent system loss). That is roughly 2 percent above the mean across the towns we cover, so latitude is working slightly in your favour here.

Scaled up, a 360 kWp array, sized to what the nearest school scheme on record applied for, 18 miles away at Sevenoaks, models at about 326,200 kWh a year before shading, and needs roughly 1,069 square metres of clear roof. We take the size from the nearest real application rather than a round number, so the example is anchored to something a planning officer has already seen.

Spread across the year that is about 83,500 kWh landing in July and August and roughly 17,000 kWh across December and January. UK Power Networks sets what may go back onto the network here, so the July figure is the one worth putting in front of a governing body first.

FIG. 1 Brixton against the rest of Greater London
  • Chelsea908
  • Havering908
  • Wandsworth908
  • Bermondsey907
  • Brixton906
  • Clapham906
  • Notting Hill906
  • Vauxhall906
  • Ealing905

Brixton ranks 17 of 50 towns we cover in Greater London on modelled yield, against a national mean of 886 kWh per kWp. The county runs from 847 to 987, a spread of 140 kWh per kWp. On a 500 kWp array that is about 70,000 kWh a year between the strongest and weakest town in the county.

Bars are zero based, so length is proportional to the figure. Where a county is flat, that is the finding: latitude is not the lever, the timetable is. Source: EU PVGIS v5.2, modelled per town

School solar on record near Brixton

There is no school entry for Brixton and the area around it in the Renewable Energy Planning Database. The register is dependable for anything from a megawatt upward and incomplete below it, and a school array is usually nearer a fifth of a megawatt, so this says more about the threshold than about Brixton.

Look 18 miles out and there is one: The Sennocke Centre, High Street in Sevenoaks, 360 kWp, applied for by Sevenoaks School, which holds consent and is awaiting construction. None of our doing. It is a public planning record, and the nearest evidence available of how an application like yours is treated around here. Source: Renewable Energy Planning Database, Q1 2026.

Term dates against the Brixton generation curve

A Brixton school roof generates most in the weeks its buildings are closed. 25.6 percent of the modelled year lands in July and August alone (EU PVGIS v5.2), and the summer holiday takes roughly six of those nine weeks out of the timetable. July is the single strongest month here at 13.9 percent of the annual total, and it falls almost entirely inside the holiday.

Winter reverses it. December and January between them return 5.2 percent of the modelled year, and that is when the heating, the lighting and a full register are all drawing at the same time. The roof makes 5.7 times as much in July as it does in December, and August alone outproduces December by about 4.8 to one. 73 percent of the year arrives between April and September, and the point of that figure is not that the summer half goes unused, because April, May and June are full teaching months that draw hard. It is that the concentration peaks in the few weeks at the end of it when the building is shut.

Summed over the year, about 49 percent of what a school roof makes arrives while the school is open. For a business trading every weekday the equivalent is roughly 71 percent. Nothing about Brixton changes that ratio much, but plenty about your own site changes what to do with it.

Then there is the afternoon. From roughly three o'clock the building empties while the roof is still working, so a system sized on annual consumption will over-generate in exactly the hours nobody is there. We size on half hourly data for that reason.

A Brixton governing body should read that as a sizing constraint, not a reason to stop. The base load that runs through the holidays, servers, comms, refrigeration, ventilation and hot water, is the floor the array should be built up from, and everything above it has to be justified by storage, export or summer occupancy.

We set out the whole argument about term dates and the generation curve on the home page, and what it does to a payback figure under costs.

FIG. 2 A Brixton roof against the English school year
0 35 70 105 140 Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec kWh August: nobody in the building
  • generated while the school is open
  • generated at a weekend or in the holidays
The same figures as a table
Monthly output for a 1 kWp array in Brixton, split by whether the day is a school session day. Across the year 49 percent of generation lands while the school is open.
Month Session days Output, kWh per kWp School open School closed
Jan 20 25 16 9
Feb 15 38 20 18
Mar 21 73 49 24
Apr 12 105 42 63
May 17 120 66 54
Jun 21 124 87 37
Jul 11 126 45 81
Aug 0 106 0 106
Sep 20 83 55 28
Oct 17 52 29 23
Nov 21 31 22 9
Dec 15 22 11 11
Year 190 905 442 463
Per kWp installed, month by month, separating generation while the school is open from generation at a weekend or in the holidays. 73 percent of the Brixton year sits between April and September, most of which is term time; it is the tail of that period, the last week of July and all of August, that the school is not there for. The daily split is a flat apportionment of each month, not a metered one. Session days follow a typical English school year of 190 days. Your own trust or authority may differ by a few days either way. Source: EU PVGIS v5.2, session days from a typical school calendar

Lambeth schools, phase by phase

Lambeth has 90 open state-funded schools and colleges on the DfE register teaching 32,746 pupils between them. Source: DfE Get Information About Schools.

The split is 61 primary, 16 secondary, 7 special and 6 further education, at an average of 364 pupils a site. A ratio of 3.8 to one tells you where the roof area is. It is not with the 61 primaries, which mostly offer a hall and a teaching block each, but with the larger sites that were built with a sports hall and a dining block attached.

Where a multi-academy trust holds several of those sites, surveying the estate in one pass beats taking a roof at a time. The design work, the connection applications and the procurement paperwork are the same job repeated, and a trust that runs them together gets a better answer on all three.

Aerial view of a school site with teaching blocks of several different ages, a sports hall and a playing field, solar arrays on two of the flat roofs
A school site with blocks of several ages, which is the usual starting point for a trust estate survey.

Grid connection through UK Power Networks

Connections around Brixton are handled by UK Power Networks, which sets the export limit for the site. Above 3.68 kW per phase the connection runs under G99, so the export limit is agreed in advance rather than assumed. Where the local network is constrained, an export-limited connection usually still makes the scheme work, because a school uses most of what the roof makes during the working day.

Book the survey

Book a roof survey at your Brixton school

We survey school and college roofs throughout Greater London. We need the postcode, a rough roof area and your half hourly meter data if the trust has it. From that we model what the roof carries, what it generates against the timetable, and which of the funding routes actually suits a school of your size.

Lenzie Consulting Ltd arranges the survey and passes your details to an MCS-certified installation partner so they can quote. We do not carry out the installation ourselves.

We pass your details to our MCS-certified installation partner so they can quote. Read the privacy notice.

Brixton school solar, answered

Is there enough sun around Brixton for this to be worth doing?
The model gives 906 kWh a year for every kWp installed at this latitude, so a 360 kWp array comes out at roughly 326,200 kWh a year before shading. It needs about 1,069 square metres of clear roof once walkways and rooflight setbacks are allowed for. Source: EU PVGIS v5.2, SARAH3, 10 degree pitch, 14 percent system loss.
Does a Brixton school waste its generation in August?
25.6 percent of the modelled annual output for Brixton falls in July and August, when the buildings are closed for most of six weeks (EU PVGIS v5.2). It does not go to waste, but it only has three places to go: the base load that runs regardless, such as servers, catering refrigeration and ventilation; storage; or export under an agreement with UK Power Networks. We model all three against your half hourly data before an array is sized.
Will the network around Brixton accept the export?
UK Power Networks is the distribution network operator for Greater London. Anything above 3.68 kW per phase connects under G99, and the application fixes the export limit. On a school site the incoming supply is often the binding constraint rather than the roof, so we ask that question before anyone sizes an array.
How many schools are there around Brixton?
Lambeth has 90 open state-funded schools and colleges on the DfE register, with 32,746 pupils on roll. Source: DfE Get Information About Schools. We survey across the whole of that area, and where a trust holds several sites we look at them in one pass.