Specialist solar panels for schools in Southwark
A kilowatt-peak on a Southwark school roof models at 903 kWh a year, above the mean across the towns we cover, and the roofs it applies to are mostly carrying nothing. The survey records sheet type, remaining life, purlin spacing and the state of the incoming supply, and the model runs off your own meter data rather than an average.
903 kWh per kWp a year at this latitude, so a 360 kWp array, the size applied for at the nearest school scheme on record, models at about 325,100 kWh. Source: EU PVGIS v5.2, SARAH3, 10 degree pitch, 14 percent system loss.
Book a roof survey in Southwark- 1 teaching block
- 2 hall and kitchen
- 3 sports hall
- 4 1960s block, no array
- first phase
- later phase
Illustrative layout for an estate of this size. The array is drawn at about 345 kWp, roughly 53 percent of the 650 kWp these three roofs would hold, because a school sizes to the load it can use in term time rather than to the roof it has: generation it cannot use is exported at a much lower rate than it pays to import. The hatched block carries no array because its structure has not been assessed, which on a school of that era is the usual starting point rather than an exception. Your own figures, and which of your blocks can take an array, come from the roof survey.
Solar PV for academy trusts across Greater London
A one kilowatt-peak array on a shallow pitched roof in Southwark models at 903 kWh a year, from modelled irradiation of 1,163 kWh per square metre in the plane of the array (EU PVGIS v5.2, SARAH3, 10 degree pitch, 14 percent system loss). That is roughly 2 percent above the mean across the towns we cover, so latitude is working slightly in your favour here.
Scaled up, a 360 kWp array, sized to what the nearest school scheme on record applied for, 20 miles away at Sevenoaks, models at about 325,100 kWh a year before shading, and needs roughly 1,069 square metres of clear roof. We take the size from the nearest real application rather than a round number, so the example is anchored to something a planning officer has already seen.
Spread across the year that is about 82,900 kWh landing in July and August and roughly 16,900 kWh across December and January. UK Power Networks sets what may go back onto the network here, so the July figure is the one worth putting in front of a governing body first.
Southwark ranks 32 of 50 towns we cover in Greater London on modelled yield, against a national mean of 886 kWh per kWp. The county runs from 847 to 987, a spread of 140 kWh per kWp. On a 500 kWp array that is about 70,000 kWh a year between the strongest and weakest town in the county.
The planning position for Southwark schools
Search the Renewable Energy Planning Database for Southwark and the area around it and nothing comes back under education. That is worth stating plainly and then setting aside: the register is built around generating stations, a school array is a fraction of the size it captures reliably, and plenty of school roofs never appear in any national record at all.
The closest recorded one is about 20 miles away at Sevenoaks: The Sennocke Centre, High Street, a 360 kWp roof mounted array applied for by Sevenoaks School, which holds consent and is awaiting construction. We were not involved in it. We cite it because it is a public record of what has cleared planning in this part of Kent. Source: Renewable Energy Planning Database, Q1 2026.
Why demand in Southwark falls as the roof peaks
The generating year and the school year are out of step in Southwark. July and August carry 25.5 percent of the modelled output (EU PVGIS v5.2), and the site is closed for most of those nine weeks. July is the single strongest month here at 13.8 percent of the annual total, and it falls almost entirely inside the holiday.
At the other end of the year the mismatch flips. Only 5.2 percent of output falls in December and January, the two months when a Southwark school is fully occupied and its heating and lighting are at their heaviest. The roof makes 5.7 times as much in July as it does in December, and August alone outproduces December by about 4.8 to one. 73 percent of the year arrives between April and September, and the point of that figure is not that the summer half goes unused, because April, May and June are full teaching months that draw hard. It is that the concentration peaks in the few weeks at the end of it when the building is shut.
Nationally this comes out at about 49 percent of annual generation falling on a session day. A business open every weekday sees roughly 71 percent. The 22 point gap is what a school appraisal has to absorb, and it is much the same in Southwark as anywhere else.
Inside the day it happens again. The roof is still at three quarters of its peak at four in the afternoon, by which time a Southwark school is largely empty, so the hours that look best on a generation chart are the worst on a consumption one.
The conclusion is not that a Southwark school should do nothing. It is that the array should be sized to the load that survives the holidays, which is usually the server room, the catering refrigeration, the ventilation and the hot water, plus whatever the site lets out over the summer. Anything above that line needs storage or an export agreement with UK Power Networks to earn its keep.
We set out the complete version of the term time arithmetic on the home page, and what it does to a payback figure under costs.
- generated while the school is open
- generated at a weekend or in the holidays
The same figures as a table
| Month | Session days | Output, kWh per kWp | School open | School closed |
|---|---|---|---|---|
| Jan | 20 | 25 | 16 | 9 |
| Feb | 15 | 39 | 21 | 18 |
| Mar | 21 | 73 | 49 | 24 |
| Apr | 12 | 105 | 42 | 63 |
| May | 17 | 119 | 65 | 54 |
| Jun | 21 | 124 | 87 | 37 |
| Jul | 11 | 125 | 44 | 81 |
| Aug | 0 | 105 | 0 | 105 |
| Sep | 20 | 83 | 55 | 28 |
| Oct | 17 | 52 | 29 | 23 |
| Nov | 21 | 31 | 22 | 9 |
| Dec | 15 | 22 | 11 | 11 |
| Year | 190 | 903 | 441 | 462 |
The school estate in Southwark
Southwark has 101 open state-funded schools and colleges on the DfE register teaching 40,961 pupils between them. Source: DfE Get Information About Schools.
The split is 72 primary, 20 secondary and 9 special, at an average of 406 pupils a site. 3.6 primaries per secondary is a mix weighted towards small sites. The roof area, and therefore most of the generation, sits with the 20 secondaries.
Across an estate of that size the roofs will not be in the same condition, and that is the point of surveying them together: the block with the best orientation is often not the block whose covering has twenty years left in it.
Grid connection through UK Power Networks
UK Power Networks is the network operator here, and their answer on export capacity shapes the design. Any commercial array above 3.68 kW per phase connects under G99 rather than G98, and the application fixes what you are allowed to push back onto the network. If the local network is tight, limiting export rarely breaks the case here: most of the generation is consumed on site while the building is working.
Send us the school postcode
We survey school and college roofs throughout Greater London. We need the postcode, a rough roof area and your half hourly meter data if the trust has it. From that we model what the roof carries, what it generates against the timetable, and which of the funding routes actually suits a school of your size.
Lenzie Consulting Ltd arranges the survey and passes your details to an MCS-certified installation partner so they can quote. We do not carry out the installation ourselves.
What Southwark trusts ask before a survey
- How much would a school roof near Southwark generate?
- Modelled at 903 kWh per kWp a year, a 360 kWp array on a Southwark school models at about 325,100 kWh. What decides whether that is worth doing is how much of it the school uses itself, not the total. Source: EU PVGIS v5.2, SARAH3, 10 degree pitch, 14 percent system loss.
- How does the school year affect a solar scheme in Southwark?
- It goes somewhere, just not into the timetable. 25.5 percent of the Southwark generating year lands in July and August (EU PVGIS v5.2), and a closed school still runs servers, comms, refrigeration and ventilation. What that base load does not absorb is either stored, exported under an agreement with UK Power Networks, or a sign the array is too big. We test which before sizing anything.
- Which network operator handles the connection at a Southwark school?
- Applications go to UK Power Networks, who run the network across Greater London. An export-limited offer usually still works for a school, because the summer surplus is the part you were least likely to be paid much for anyway.
- How many schools are there around Southwark?
- Southwark has 101 open state-funded schools and colleges on the DfE register, with 40,961 pupils on roll. Source: DfE Get Information About Schools. We survey across the whole of that area, and where a trust holds several sites we look at them in one pass.