Specialist solar panels for schools in Leytonstone
A school roof in Leytonstone makes 5.7 times as much in July as it does in December, and the school year runs against that curve rather than with it. What we come back with is the usable roof area, the modelled output against your meter data, and the routes schools use to pay for it.
25.6% of the modelled year lands in July and August, on a roof that returns 903 kWh per kWp a year. The worked example below runs at 190 kWp, the size applied for at the nearest school scheme on record. Source: EU PVGIS v5.2, SARAH3, 10 degree pitch, 14 percent system loss.
Book a roof survey in Leytonstone- 1 teaching block
- 2 hall and kitchen
- 3 sports hall
- 4 1960s block, no array
- first phase
- later phase
Illustrative layout for an estate of this size. The array is drawn at about 345 kWp, roughly 53 percent of the 650 kWp these three roofs would hold, because a school sizes to the load it can use in term time rather than to the roof it has: generation it cannot use is exported at a much lower rate than it pays to import. The hatched block carries no array because its structure has not been assessed, which on a school of that era is the usual starting point rather than an exception. Your own figures, and which of your blocks can take an array, come from the roof survey.
School rooftop solar across Greater London
A one kilowatt-peak array on a shallow pitched roof in Leytonstone models at 903 kWh a year, from modelled irradiation of 1,162 kWh per square metre in the plane of the array (EU PVGIS v5.2, SARAH3, 10 degree pitch, 14 percent system loss). That is roughly 2 percent above the mean across the towns we cover, so latitude is working slightly in your favour here.
Scaled up, a 190 kWp array, sized to what the nearest school scheme on record applied for, 18 miles away at Welwyn Garden City, models at about 171,600 kWh a year before shading, and needs roughly 564 square metres of clear roof. We take the size from the nearest real application rather than a round number, so the example is anchored to something a planning officer has already seen.
Spread across the year that is about 43,900 kWh landing in July and August and roughly 8,900 kWh across December and January. UK Power Networks sets what may go back onto the network here, so the July figure is the one worth putting in front of a governing body first.
Leytonstone ranks 29 of 50 towns we cover in Greater London on modelled yield, against a national mean of 886 kWh per kWp. The county runs from 847 to 987, a spread of 140 kWh per kWp. On a 500 kWp array that is about 70,000 kWh a year between the strongest and weakest town in the county.
What the planning record shows around Leytonstone
The Renewable Energy Planning Database holds no school scheme for Leytonstone and the area around it. Read that as a gap in the record, not a gap in the roofs: the database is reliable above one megawatt and thin below it, and a school array is typically a fifth of a megawatt.
The nearest education scheme on the record is 18 miles from Leytonstone, at Welwyn Garden City: 190 kWp at Ridgeway Academy, Herns Lane, applicant Earthpoints Limited, which holds consent and is awaiting construction. That is someone else's application, not ours, and it is here because it shows what Hertfordshire planning has already accepted at an education site. Source: Renewable Energy Planning Database, Q1 2026.
The summer holiday problem for a Leytonstone school
25.6 percent of the annual output modelled for Leytonstone arrives in the two months a school uses least (EU PVGIS v5.2). Term ends in the third week of July and the buildings stay largely empty until September. July is the single strongest month here at 13.8 percent of the annual total, and it falls almost entirely inside the holiday.
The inverse holds at the other end. December and January together return only 5.2 percent of the year, and those are the months with the heating, the lighting and the full timetable all running at once. The roof makes 5.7 times as much in July as it does in December, and August alone outproduces December by about 4.8 to one. 73 percent of the year arrives between April and September, and the point of that figure is not that the summer half goes unused, because April, May and June are full teaching months that draw hard. It is that the concentration peaks in the few weeks at the end of it when the building is shut.
Summed over the year, about 49 percent of what a school roof makes arrives while the school is open. For a business trading every weekday the equivalent is roughly 71 percent. Nothing about Leytonstone changes that ratio much, but plenty about your own site changes what to do with it.
And the week has the same hole in it. Two days in seven the site is closed altogether, at no cost to the generation, which is part of why the session day share sits where it does. Weekend lettings are the one lever a Leytonstone school has over that, and they are worth counting properly.
A Leytonstone governing body should read that as a sizing constraint, not a reason to stop. The base load that runs through the holidays, servers, comms, refrigeration, ventilation and hot water, is the floor the array should be built up from, and everything above it has to be justified by storage, export or summer occupancy.
We set out the full treatment of the school year against the generation curve on the home page, and what it does to a payback figure under costs.
- generated while the school is open
- generated at a weekend or in the holidays
The same figures as a table
| Month | Session days | Output, kWh per kWp | School open | School closed |
|---|---|---|---|---|
| Jan | 20 | 25 | 16 | 9 |
| Feb | 15 | 39 | 21 | 18 |
| Mar | 21 | 73 | 49 | 24 |
| Apr | 12 | 105 | 42 | 63 |
| May | 17 | 119 | 65 | 54 |
| Jun | 21 | 124 | 87 | 37 |
| Jul | 11 | 125 | 44 | 81 |
| Aug | 0 | 106 | 0 | 106 |
| Sep | 20 | 83 | 55 | 28 |
| Oct | 17 | 51 | 28 | 23 |
| Nov | 21 | 31 | 22 | 9 |
| Dec | 15 | 22 | 11 | 11 |
| Year | 190 | 903 | 440 | 463 |
How many schools Waltham Forest has
Waltham Forest has 79 open state-funded schools and colleges on the DfE register teaching 41,782 pupils between them. Source: DfE Get Information About Schools.
The split is 53 primary, 18 secondary, 4 special and 4 further education, at an average of 529 pupils a site. That is 2.9 primaries for every secondary, which is the ratio that matters for a roof: a primary of a few hundred pupils usually offers a hall roof and one teaching block, while a secondary site carries a sports hall, a dining block and several flat roofs.
If your trust holds several of them, the sequencing question comes before the sizing question. Roof age, covering type and the state of the incoming supply vary block by block across an estate, and that is normally what sets the order of works.
Grid connection through UK Power Networks
UK Power Networks operates the distribution network across Greater London, so the export application goes to them. Anything larger than 3.68 kW per phase falls under G99, which means an application before commissioning rather than a notification afterwards. A constrained network is not the end of a scheme. Capping export costs little when the building already absorbs most of what the roof produces.
Start with the Leytonstone roof
The first survey answers three questions at once: what the roofs carry, what they generate against your own timetable, and how a Leytonstone school pays for it. Send the postcode, an approximate roof area per block and half hourly meter data if the school can get it from its supplier.
Lenzie Consulting Ltd arranges the survey and passes your details to an MCS-certified installation partner so they can quote. We do not carry out the installation ourselves.
Questions governors ask us about Leytonstone schools
- How much would a school roof near Leytonstone generate?
- Modelled at 903 kWh per kWp a year, a 190 kWp array on a Leytonstone school models at about 171,600 kWh. What decides whether that is worth doing is how much of it the school uses itself, not the total. Source: EU PVGIS v5.2, SARAH3, 10 degree pitch, 14 percent system loss.
- How does the school year affect a solar scheme in Leytonstone?
- It goes somewhere, just not into the timetable. 25.6 percent of the Leytonstone generating year lands in July and August (EU PVGIS v5.2), and a closed school still runs servers, comms, refrigeration and ventilation. What that base load does not absorb is either stored, exported under an agreement with UK Power Networks, or a sign the array is too big. We test which before sizing anything.
- Which network operator handles the connection at a Leytonstone school?
- Applications go to UK Power Networks, who run the network across Greater London. An export-limited offer usually still works for a school, because the summer surplus is the part you were least likely to be paid much for anyway.
- How many schools are there around Leytonstone?
- Waltham Forest has 79 open state-funded schools and colleges on the DfE register, with 41,782 pupils on roll. Source: DfE Get Information About Schools. We survey across the whole of that area, and where a trust holds several sites we look at them in one pass.