Specialist solar panels for schools in Lewisham

A kilowatt-peak on a Lewisham school roof models at 904 kWh a year, above the mean across the towns we cover, and the roofs it applies to are mostly carrying nothing. The survey records sheet type, remaining life, purlin spacing and the state of the incoming supply, and the model runs off your own meter data rather than an average.

904 kWh per kWp a year at this latitude, so a 360 kWp array, the size applied for at the nearest school scheme on record, models at about 325,400 kWh. Source: EU PVGIS v5.2, SARAH3, 10 degree pitch, 14 percent system loss.

Book a roof survey in Lewisham
playing field 4 1 2 3 no array pending structural assessment 0 40 m N
  1. 1 teaching block
  2. 2 hall and kitchen
  3. 3 sports hall
  4. 4 1960s block, no array
  5. first phase
  6. later phase
Drawing Typical school site, Lewisham scale
Blocks 4, 3 with array
Array about 345 kWp
Yield about 312,000 kWh/yr
Frontage about 90 m / Rev A / Greater London

Illustrative layout for an estate of this size. The array is drawn at about 345 kWp, roughly 53 percent of the 650 kWp these three roofs would hold, because a school sizes to the load it can use in term time rather than to the roof it has: generation it cannot use is exported at a much lower rate than it pays to import. The hatched block carries no array because its structure has not been assessed, which on a school of that era is the usual starting point rather than an exception. Your own figures, and which of your blocks can take an array, come from the roof survey.

Lewisham / Greater London
A two storey 1970s school block with a shallow pitched roof covered in solar panels, empty playground in front and a playing field beyond
School buildings of the kind we survey across Greater London. Not a named school and not our work.

Solar PV for academy trusts across Greater London

A one kilowatt-peak array on a shallow pitched roof in Lewisham models at 904 kWh a year, from modelled irradiation of 1,164 kWh per square metre in the plane of the array (EU PVGIS v5.2, SARAH3, 10 degree pitch, 14 percent system loss). That is roughly 2 percent above the mean across the towns we cover, so latitude is working slightly in your favour here.

Scaled up, a 360 kWp array, sized to what the nearest school scheme on record applied for, 15 miles away at Sevenoaks, models at about 325,400 kWh a year before shading, and needs roughly 1,069 square metres of clear roof. We take the size from the nearest real application rather than a round number, so the example is anchored to something a planning officer has already seen.

Spread across the year that is about 83,600 kWh landing in July and August and roughly 16,900 kWh across December and January. UK Power Networks sets what may go back onto the network here, so the July figure is the one worth putting in front of a governing body first.

FIG. 1 Lewisham against the rest of Greater London
  • Notting Hill906
  • Vauxhall906
  • Ealing905
  • Hillingdon904
  • Lewisham904
  • Stratford904
  • Wimbledon904
  • City of London903
  • Hackney903

Lewisham ranks 23 of 50 towns we cover in Greater London on modelled yield, against a national mean of 886 kWh per kWp. The county runs from 847 to 987, a spread of 140 kWh per kWp. On a 500 kWp array that is about 70,000 kWh a year between the strongest and weakest town in the county.

Bars are zero based, so length is proportional to the figure. Where a county is flat, that is the finding: latitude is not the lever, the timetable is. Source: EU PVGIS v5.2, modelled per town

The planning position for Lewisham schools

The Renewable Energy Planning Database holds no school scheme for Lewisham and the area around it. Read that as a gap in the record, not a gap in the roofs: the database is reliable above one megawatt and thin below it, and a school array is typically a fifth of a megawatt.

The closest recorded one is about 15 miles away at Sevenoaks: The Sennocke Centre, High Street, a 360 kWp roof mounted array applied for by Sevenoaks School, which holds consent and is awaiting construction. We were not involved in it. We cite it because it is a public record of what has cleared planning in this part of Kent. Source: Renewable Energy Planning Database, Q1 2026.

Why demand in Lewisham falls as the roof peaks

The generating year and the school year are out of step in Lewisham. July and August carry 25.7 percent of the modelled output (EU PVGIS v5.2), and the site is closed for most of those nine weeks. July is the single strongest month here at 13.9 percent of the annual total, and it falls almost entirely inside the holiday.

At the other end of the year the mismatch flips. Only 5.2 percent of output falls in December and January, the two months when a Lewisham school is fully occupied and its heating and lighting are at their heaviest. The roof makes 5.7 times as much in July as it does in December, and August alone outproduces December by about 4.9 to one. 73 percent of the year arrives between April and September, and the point of that figure is not that the summer half goes unused, because April, May and June are full teaching months that draw hard. It is that the concentration peaks in the few weeks at the end of it when the building is shut.

Nationally this comes out at about 49 percent of annual generation falling on a session day. A business open every weekday sees roughly 71 percent. The 22 point gap is what a school appraisal has to absorb, and it is much the same in Lewisham as anywhere else.

The weekly pattern repeats the annual one. Saturdays and Sundays generate as well as any other day and consume almost nothing, so before storage or export is even discussed it is worth knowing what the site does at a weekend, which only half hourly data will tell you.

The conclusion is not that a Lewisham school should do nothing. It is that the array should be sized to the load that survives the holidays, which is usually the server room, the catering refrigeration, the ventilation and the hot water, plus whatever the site lets out over the summer. Anything above that line needs storage or an export agreement with UK Power Networks to earn its keep.

We set out the complete version of the term time arithmetic on the home page, and what it does to a payback figure under costs.

FIG. 2 A Lewisham roof against the English school year
0 35 70 105 140 Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec kWh August: nobody in the building
  • generated while the school is open
  • generated at a weekend or in the holidays
The same figures as a table
Monthly output for a 1 kWp array in Lewisham, split by whether the day is a school session day. Across the year 49 percent of generation lands while the school is open.
Month Session days Output, kWh per kWp School open School closed
Jan 20 25 16 9
Feb 15 38 20 18
Mar 21 72 49 23
Apr 12 105 42 63
May 17 120 66 54
Jun 21 124 87 37
Jul 11 126 45 81
Aug 0 107 0 107
Sep 20 83 55 28
Oct 17 52 29 23
Nov 21 31 22 9
Dec 15 22 11 11
Year 190 905 442 463
Output per kWp installed, split by whether the day is a session day. July and August are 25.7 percent of the Lewisham year and the school is shut for most of them. Each month's total is spread evenly across its days, which is the only split available without half hourly readings. Session days follow a typical English school year of 190 days. Your own trust or authority may differ by a few days either way. Source: EU PVGIS v5.2, session days from a typical school calendar

The school estate in Lewisham

Lewisham has 86 open state-funded schools and colleges on the DfE register teaching 36,819 pupils between them. Source: DfE Get Information About Schools.

The split is 66 primary, 14 secondary, 5 special and 1 further education, at an average of 428 pupils a site. That is 4.7 primaries for every secondary, which is the ratio that matters for a roof: a primary of a few hundred pupils usually offers a hall roof and one teaching block, while a secondary site carries a sports hall, a dining block and several flat roofs.

If your trust holds several of them, the sequencing question comes before the sizing question. Roof age, covering type and the state of the incoming supply vary block by block across an estate, and that is normally what sets the order of works.

Aerial view of a school site with teaching blocks of several different ages, a sports hall and a playing field, solar arrays on two of the flat roofs
A school site with blocks of several ages, which is the usual starting point for a trust estate survey.

Grid connection through UK Power Networks

UK Power Networks is the network operator here, and their answer on export capacity shapes the design. Any commercial array above 3.68 kW per phase connects under G99 rather than G98, and the application fixes what you are allowed to push back onto the network. If the local network is tight, limiting export rarely breaks the case here: most of the generation is consumed on site while the building is working.

Book the survey

Send us the school postcode

A survey in Lewisham starts with three things from you. Give us the postcode, the approximate roof area and, if you can get it from your supplier, twelve months of half hourly readings. What comes back is a usable area figure per block, output modelled against your own load rather than an average, and the ways a Lewisham school can pay for it.

Lenzie Consulting Ltd arranges the survey and passes your details to an MCS-certified installation partner so they can quote. We do not carry out the installation ourselves.

We pass your details to our MCS-certified installation partner so they can quote. Read the privacy notice.

What Lewisham trusts ask before a survey

Is there enough sun around Lewisham for this to be worth doing?
The model gives 904 kWh a year for every kWp installed at this latitude, so a 360 kWp array comes out at roughly 325,400 kWh a year before shading. It needs about 1,069 square metres of clear roof once walkways and rooflight setbacks are allowed for. Source: EU PVGIS v5.2, SARAH3, 10 degree pitch, 14 percent system loss.
Does a Lewisham school waste its generation in August?
25.7 percent of the modelled annual output for Lewisham falls in July and August, when the buildings are closed for most of six weeks (EU PVGIS v5.2). It does not go to waste, but it only has three places to go: the base load that runs regardless, such as servers, catering refrigeration and ventilation; storage; or export under an agreement with UK Power Networks. We model all three against your half hourly data before an array is sized.
Will the network around Lewisham accept the export?
UK Power Networks is the distribution network operator for Greater London. Anything above 3.68 kW per phase connects under G99, and the application fixes the export limit. On a school site the incoming supply is often the binding constraint rather than the roof, so we ask that question before anyone sizes an array.
How many schools are there around Lewisham?
Lewisham has 86 open state-funded schools and colleges on the DfE register, with 36,819 pupils on roll. Source: DfE Get Information About Schools. We survey across the whole of that area, and where a trust holds several sites we look at them in one pass.