Specialist solar panels for schools in Hounslow
Hounslow has 76 state-funded schools and colleges, and most of them are buying electricity in exactly the hours their own roofs could be making it. We start with the roof build up and the age of the covering, because across a school estate that is usually what decides which block goes first.
910 kWh per kWp a year at this latitude, so a 490 kWp array, the size applied for at the nearest school scheme on record, models at about 445,900 kWh. Source: EU PVGIS v5.2, SARAH3, 10 degree pitch, 14 percent system loss.
Book a roof survey in Hounslow- 1 teaching block
- 2 hall and kitchen
- 3 sports hall
- 4 1960s block, no array
- first phase
- later phase
Illustrative layout for an estate of this size. The array is drawn at about 345 kWp, roughly 53 percent of the 650 kWp these three roofs would hold, because a school sizes to the load it can use in term time rather than to the roof it has: generation it cannot use is exported at a much lower rate than it pays to import. The hatched block carries no array because its structure has not been assessed, which on a school of that era is the usual starting point rather than an exception. Your own figures, and which of your blocks can take an array, come from the roof survey.
Solar for education buildings across Greater London
A one kilowatt-peak array on a shallow pitched roof in Hounslow models at 910 kWh a year, from modelled irradiation of 1,169 kWh per square metre in the plane of the array (EU PVGIS v5.2, SARAH3, 10 degree pitch, 14 percent system loss). Hounslow models 3 percent above our mean. That is a real advantage, though a smaller one than the difference between an array matched to the timetable and one matched to the roof.
Scaled up, a 490 kWp array, sized to what the nearest school scheme on record applied for, 12 miles away at Windsor, models at about 445,900 kWh a year before shading, and needs roughly 1,455 square metres of clear roof. We take the size from the nearest real application rather than a round number, so the example is anchored to something a planning officer has already seen.
Spread across the year that is about 114,600 kWh landing in July and August and roughly 23,200 kWh across December and January. UK Power Networks sets what may go back onto the network here, so the July figure is the one worth putting in front of a governing body first.
Hounslow ranks 7 of 50 towns we cover in Greater London on modelled yield, against a national mean of 886 kWh per kWp. The county runs from 847 to 987, a spread of 140 kWh per kWp. On a 500 kWp array that is about 70,000 kWh a year between the strongest and weakest town in the county.
School solar on record near Hounslow
No school or college solar scheme appears in Hounslow and the area around it in the Renewable Energy Planning Database. That is a reporting threshold rather than a verdict. The database records generating stations from one megawatt upward reliably and smaller ones patchily, and almost every school array is a fraction of that, so a roof full of panels on a Hounslow secondary could be generating today without ever reaching it.
Look 12 miles out and there is one: St Johns Beaumont School, Priest Hill in Windsor, 260 kWp, applied for by St Johns Beaumont School, which was refused. None of our doing. It is a public planning record, and the nearest evidence available of how an application like yours is treated around here. Source: Renewable Energy Planning Database, Q1 2026.
Term dates against the Hounslow generation curve
A Hounslow school roof generates most in the weeks its buildings are closed. 25.7 percent of the modelled year lands in July and August alone (EU PVGIS v5.2), and the summer holiday takes roughly six of those nine weeks out of the timetable. July is the single strongest month here at 13.9 percent of the annual total, and it falls almost entirely inside the holiday.
Winter reverses it. December and January between them return 5.2 percent of the modelled year, and that is when the heating, the lighting and a full register are all drawing at the same time. The roof makes 5.7 times as much in July as it does in December, and August alone outproduces December by about 4.9 to one. 73 percent of the year arrives between April and September, and the point of that figure is not that the summer half goes unused, because April, May and June are full teaching months that draw hard. It is that the concentration peaks in the few weeks at the end of it when the building is shut.
Across the country the arithmetic settles at roughly 49 percent of output on a session day, against about 71 percent for a weekday business. That figure hardly varies by location, which is why the local numbers that matter here are the yield, the roofs and what has already cleared planning nearby.
Then there is the afternoon. From roughly three o'clock the building empties while the roof is still working, so a system sized on annual consumption will over-generate in exactly the hours nobody is there. We size on half hourly data for that reason.
That argues for a particular shape of scheme rather than against one. Size to the load that does not stop at the end of term, count in lettings, holiday clubs and summer works honestly rather than optimistically, and then decide whether storage or an export arrangement with UK Power Networks pays for the surplus that is left.
We set out the complete version of the term time arithmetic on the home page, and what it does to a payback figure under costs.
- generated while the school is open
- generated at a weekend or in the holidays
The same figures as a table
| Month | Session days | Output, kWh per kWp | School open | School closed |
|---|---|---|---|---|
| Jan | 20 | 25 | 16 | 9 |
| Feb | 15 | 39 | 21 | 18 |
| Mar | 21 | 73 | 49 | 24 |
| Apr | 12 | 105 | 42 | 63 |
| May | 17 | 120 | 66 | 54 |
| Jun | 21 | 125 | 88 | 38 |
| Jul | 11 | 126 | 45 | 81 |
| Aug | 0 | 107 | 0 | 107 |
| Sep | 20 | 83 | 55 | 28 |
| Oct | 17 | 52 | 29 | 23 |
| Nov | 21 | 31 | 22 | 9 |
| Dec | 15 | 22 | 11 | 11 |
| Year | 190 | 908 | 444 | 464 |
Grid connection through UK Power Networks
UK Power Networks is the network operator here, and their answer on export capacity shapes the design. Any commercial array above 3.68 kW per phase connects under G99 rather than G98, and the application fixes what you are allowed to push back onto the network. If the local network is tight, limiting export rarely breaks the case here: most of the generation is consumed on site while the building is working.
Hounslow schools, phase by phase
Hounslow has 76 open state-funded schools and colleges on the DfE register teaching 44,535 pupils between them. Source: DfE Get Information About Schools.
The split is 49 primary, 21 secondary, 5 special and 1 further education, at an average of 586 pupils a site. Read 2.3 primaries per secondary as a sequencing hint rather than a statistic. A primary is a single survey visit and a modest array; a secondary is several roofs of different ages on one site, and that is where both the area and the complications are.
A trust holding more than one of these sites should look at them together. Grouping the surveys turns the grid question, the funding question and the procurement route into one exercise rather than four, and it usually changes which roof goes first.
Book a roof survey at your Hounslow school
Lenzie Consulting Ltd arranges roof surveys for schools across Greater London. Send the school postcode and a rough idea of the roof area, and the last twelve months of half hourly meter data if the school holds it. We come back with what the roofs can carry, what they would generate against your own consumption, and the funding routes open to a school.
Lenzie Consulting Ltd arranges the survey and passes your details to an MCS-certified installation partner so they can quote. We do not carry out the installation ourselves.
Hounslow school solar, answered
- How much would a school roof near Hounslow generate?
- Modelled at 910 kWh per kWp a year, a 490 kWp array on a Hounslow school models at about 445,900 kWh. What decides whether that is worth doing is how much of it the school uses itself, not the total. Source: EU PVGIS v5.2, SARAH3, 10 degree pitch, 14 percent system loss.
- How does the school year affect a solar scheme in Hounslow?
- It goes somewhere, just not into the timetable. 25.7 percent of the Hounslow generating year lands in July and August (EU PVGIS v5.2), and a closed school still runs servers, comms, refrigeration and ventilation. What that base load does not absorb is either stored, exported under an agreement with UK Power Networks, or a sign the array is too big. We test which before sizing anything.
- Which network operator handles the connection at a Hounslow school?
- Applications go to UK Power Networks, who run the network across Greater London. An export-limited offer usually still works for a school, because the summer surplus is the part you were least likely to be paid much for anyway.
- How many schools are there around Hounslow?
- Hounslow has 76 open state-funded schools and colleges on the DfE register, with 44,535 pupils on roll. Source: DfE Get Information About Schools. We survey across the whole of that area, and where a trust holds several sites we look at them in one pass.