Specialist solar panels for schools in Highgate

25.4 percent of what a Highgate school roof makes arrives in July and August, which is when the buildings are shut. A survey here starts with the covering and the structure, then the incoming supply, then what the timetable actually draws.

25.4% of the modelled year lands in July and August, on a roof that returns 900 kWh per kWp a year. The worked example below runs at 170 kWp, the size applied for at the nearest school scheme on record. Source: EU PVGIS v5.2, SARAH3, 10 degree pitch, 14 percent system loss.

Book a roof survey in Highgate
playing field 4 1 2 3 no array pending structural assessment 0 40 m N
  1. 1 teaching block
  2. 2 hall and kitchen
  3. 3 sports hall
  4. 4 1960s block, no array
  5. first phase
  6. later phase
Drawing Illustrative Greater London estate
Blocks 4, 3 with array
Array about 345 kWp
Yield about 311,000 kWh/yr
Frontage about 90 m / Rev A / Greater London

Illustrative layout for an estate of this size. The array is drawn at about 345 kWp, roughly 53 percent of the 650 kWp these three roofs would hold, because a school sizes to the load it can use in term time rather than to the roof it has: generation it cannot use is exported at a much lower rate than it pays to import. The hatched block carries no array because its structure has not been assessed, which on a school of that era is the usual starting point rather than an exception. Your own figures, and which of your blocks can take an array, come from the roof survey.

Highgate / Greater London
A two storey 1970s school block with a shallow pitched roof covered in solar panels, empty playground in front and a playing field beyond
School buildings of the kind we survey across Greater London. Not a named school and not our work.

Solar PV for academy trusts across Greater London

A one kilowatt-peak array on a shallow pitched roof in Highgate models at 900 kWh a year, from modelled irradiation of 1,158 kWh per square metre in the plane of the array (EU PVGIS v5.2, SARAH3, 10 degree pitch, 14 percent system loss). That puts Highgate in the middle of the national range, close enough to our mean of 886 kWh per kWp that the interesting question moves straight to consumption.

Scaled up, a 170 kWp array, sized to what the nearest school scheme on record applied for, 14 miles away at St Albans, models at about 153,000 kWh a year before shading, and needs roughly 505 square metres of clear roof. We take the size from the nearest real application rather than a round number, so the example is anchored to something a planning officer has already seen.

Spread across the year that is about 38,900 kWh landing in July and August and roughly 8,100 kWh across December and January. UK Power Networks sets what may go back onto the network here, so the July figure is the one worth putting in front of a governing body first.

FIG. 1 Highgate against the rest of Greater London
  • Tottenham902
  • Westminster902
  • Wembley901
  • Hampstead900
  • Highgate900
  • Kentish Town900
  • Barnet899
  • Enfield898
  • Walthamstow898

Highgate ranks 44 of 50 towns we cover in Greater London on modelled yield, against a national mean of 886 kWh per kWp. The county runs from 847 to 987, a spread of 140 kWh per kWp. On a 500 kWp array that is about 70,000 kWh a year between the strongest and weakest town in the county.

Bars are zero based, so length is proportional to the figure. Where a county is flat, that is the finding: latitude is not the lever, the timetable is. Source: EU PVGIS v5.2, modelled per town

The planning position for Highgate schools

The Renewable Energy Planning Database holds no school scheme for Highgate and the area around it. Read that as a gap in the record, not a gap in the roofs: the database is reliable above one megawatt and thin below it, and a school array is typically a fifth of a megawatt.

The closest recorded one is about 14 miles away at St Albans: Samuel Ryder Academy, a 200 kWp roof mounted array applied for by Scholars Education Trust, which was withdrawn before determination. We were not involved in it. We cite it because it is a public record of what has cleared planning in this part of Hertfordshire. Source: Renewable Energy Planning Database, Q1 2026.

Why demand in Highgate falls as the roof peaks

The generating year and the school year are out of step in Highgate. July and August carry 25.4 percent of the modelled output (EU PVGIS v5.2), and the site is closed for most of those nine weeks. July is the single strongest month here at 13.8 percent of the annual total, and it falls almost entirely inside the holiday.

At the other end of the year the mismatch flips. Only 5.3 percent of output falls in December and January, the two months when a Highgate school is fully occupied and its heating and lighting are at their heaviest. The roof makes 5.6 times as much in July as it does in December, and August alone outproduces December by about 4.8 to one. 73 percent of the year arrives between April and September, and the point of that figure is not that the summer half goes unused, because April, May and June are full teaching months that draw hard. It is that the concentration peaks in the few weeks at the end of it when the building is shut.

Across the country the arithmetic settles at roughly 49 percent of output on a session day, against about 71 percent for a weekday business. That figure hardly varies by location, which is why the local numbers that matter here are the yield, the roofs and what has already cleared planning nearby.

The same mismatch repeats every day. Peak generation lands between eleven and three, the timetable ends shortly after, and by four the site is down to caretaking and cleaning. An annual consumption figure cannot show that, which is why we ask for the half hourly data instead.

That argues for a particular shape of scheme rather than against one. Size to the load that does not stop at the end of term, count in lettings, holiday clubs and summer works honestly rather than optimistically, and then decide whether storage or an export arrangement with UK Power Networks pays for the surplus that is left.

We set out the full treatment of the school year against the generation curve on the home page, and what it does to a payback figure under costs.

FIG. 2 A Highgate roof against the English school year
0 35 70 105 140 Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec kWh August: nobody in the building
  • generated while the school is open
  • generated at a weekend or in the holidays
The same figures as a table
Monthly output for a 1 kWp array in Highgate, split by whether the day is a school session day. Across the year 49 percent of generation lands while the school is open.
Month Session days Output, kWh per kWp School open School closed
Jan 20 26 17 9
Feb 15 39 21 18
Mar 21 73 49 24
Apr 12 104 42 62
May 17 119 65 54
Jun 21 123 86 37
Jul 11 124 44 80
Aug 0 105 0 105
Sep 20 83 55 28
Oct 17 52 29 23
Nov 21 31 22 9
Dec 15 22 11 11
Year 190 901 441 460
Each bar is one month's output per kWp, divided at the school gate. The July bar is 5.6 times the December one and the timetable runs the other way round. We apportion a month's generation evenly over its days, having no half hourly data for your meter. Session days follow a typical English school year of 190 days. Your own trust or authority may differ by a few days either way. Source: EU PVGIS v5.2, session days from a typical school calendar

Grid connection through UK Power Networks

Connections around Highgate are handled by UK Power Networks, which sets the export limit for the site. Above 3.68 kW per phase the connection runs under G99, so the export limit is agreed in advance rather than assumed. Where the local network is constrained, an export-limited connection usually still makes the scheme work, because a school uses most of what the roof makes during the working day.

The school estate in Haringey

Haringey has 82 open state-funded schools and colleges on the DfE register teaching 34,836 pupils between them. Source: DfE Get Information About Schools.

The split is 63 primary, 12 secondary, 5 special and 2 further education, at an average of 425 pupils a site. That is 5.3 primaries for every secondary, which is the ratio that matters for a roof: a primary of a few hundred pupils usually offers a hall roof and one teaching block, while a secondary site carries a sports hall, a dining block and several flat roofs.

If your trust holds several of them, the sequencing question comes before the sizing question. Roof age, covering type and the state of the incoming supply vary block by block across an estate, and that is normally what sets the order of works.

Aerial view of a school site with teaching blocks of several different ages, a sports hall and a playing field, solar arrays on two of the flat roofs
A school site with blocks of several ages, which is the usual starting point for a trust estate survey.
Book the survey

Send us the school postcode

A survey in Highgate starts with three things from you. Give us the postcode, the approximate roof area and, if you can get it from your supplier, twelve months of half hourly readings. What comes back is a usable area figure per block, output modelled against your own load rather than an average, and the ways a Highgate school can pay for it.

Lenzie Consulting Ltd arranges the survey and passes your details to an MCS-certified installation partner so they can quote. We do not carry out the installation ourselves.

We pass your details to our MCS-certified installation partner so they can quote. Read the privacy notice.

What Highgate trusts ask before a survey

What would a 170 kWp array produce at a Highgate school?
Yes, and the figure matters more than the sunshine. 900 kWh per kWp a year puts a 170 kWp array at around 153,000 kWh, on roughly 505 square metres of roof. The value of that depends on your term time load. Source: EU PVGIS v5.2, SARAH3, 10 degree pitch, 14 percent system loss.
What happens to the electricity during the summer holidays in Highgate?
Less is wasted than governors expect, but the figure is worth seeing: 25.4 percent of the year is modelled to arrive in July and August here (EU PVGIS v5.2), against a site running on holiday base load. Lettings, holiday clubs and summer works take some of it, storage takes more, and the rest is an export question for UK Power Networks.
Who do we apply to for export near Highgate?
Only UK Power Networks can answer it for your connection. What we can say is that a capped export limit rarely breaks a school scheme, because the array that suits a school is sized to the term time load rather than to the roof.
How many schools are there around Highgate?
Haringey has 82 open state-funded schools and colleges on the DfE register, with 34,836 pupils on roll. Source: DfE Get Information About Schools. We survey across the whole of that area, and where a trust holds several sites we look at them in one pass.