Specialist solar panels for schools in Clapham
A kilowatt-peak on a Clapham school roof models at 906 kWh a year, above the mean across the towns we cover, and the roofs it applies to are mostly carrying nothing. The survey records sheet type, remaining life, purlin spacing and the state of the incoming supply, and the model runs off your own meter data rather than an average.
326,200 kWh a year, modelled for a 360 kWp array on roughly 1,069 sqm of clear roof. That is the size applied for at the nearest school scheme on record. Source: EU PVGIS v5.2, SARAH3, 10 degree pitch, 14 percent system loss.
Book a roof survey in Clapham- 1 teaching block
- 2 hall and kitchen
- 3 sports hall
- 4 1960s block, no array
- first phase
- later phase
Illustrative layout for an estate of this size. The array is drawn at about 345 kWp, roughly 53 percent of the 650 kWp these three roofs would hold, because a school sizes to the load it can use in term time rather than to the roof it has: generation it cannot use is exported at a much lower rate than it pays to import. The hatched block carries no array because its structure has not been assessed, which on a school of that era is the usual starting point rather than an exception. Your own figures, and which of your blocks can take an array, come from the roof survey.
Solar PV for academy trusts across Greater London
A one kilowatt-peak array on a shallow pitched roof in Clapham models at 906 kWh a year, from modelled irradiation of 1,163 kWh per square metre in the plane of the array (EU PVGIS v5.2, SARAH3, 10 degree pitch, 14 percent system loss). That is roughly 2 percent above the mean across the towns we cover, so latitude is working slightly in your favour here.
Scaled up, a 360 kWp array, sized to what the nearest school scheme on record applied for, 19 miles away at Sevenoaks, models at about 326,200 kWh a year before shading, and needs roughly 1,069 square metres of clear roof. We take the size from the nearest real application rather than a round number, so the example is anchored to something a planning officer has already seen.
Spread across the year that is about 83,500 kWh landing in July and August and roughly 17,000 kWh across December and January. UK Power Networks sets what may go back onto the network here, so the July figure is the one worth putting in front of a governing body first.
Clapham ranks 18 of 50 towns we cover in Greater London on modelled yield, against a national mean of 886 kWh per kWp. The county runs from 847 to 987, a spread of 140 kWh per kWp. On a 500 kWp array that is about 70,000 kWh a year between the strongest and weakest town in the county.
The planning position for Clapham schools
There is no school entry for Clapham and the area around it in the Renewable Energy Planning Database. The register is dependable for anything from a megawatt upward and incomplete below it, and a school array is usually nearer a fifth of a megawatt, so this says more about the threshold than about Clapham.
The closest recorded one is about 19 miles away at Sevenoaks: The Sennocke Centre, High Street, a 360 kWp roof mounted array applied for by Sevenoaks School, which holds consent and is awaiting construction. We were not involved in it. We cite it because it is a public record of what has cleared planning in this part of Kent. Source: Renewable Energy Planning Database, Q1 2026.
Why demand in Clapham falls as the roof peaks
The generating year and the school year are out of step in Clapham. July and August carry 25.6 percent of the modelled output (EU PVGIS v5.2), and the site is closed for most of those nine weeks. July is the single strongest month here at 13.9 percent of the annual total, and it falls almost entirely inside the holiday.
At the other end of the year the mismatch flips. Only 5.2 percent of output falls in December and January, the two months when a Clapham school is fully occupied and its heating and lighting are at their heaviest. The roof makes 5.7 times as much in July as it does in December, and August alone outproduces December by about 4.8 to one. 73 percent of the year arrives between April and September, and the point of that figure is not that the summer half goes unused, because April, May and June are full teaching months that draw hard. It is that the concentration peaks in the few weeks at the end of it when the building is shut.
Summed over the year, about 49 percent of what a school roof makes arrives while the school is open. For a business trading every weekday the equivalent is roughly 71 percent. Nothing about Clapham changes that ratio much, but plenty about your own site changes what to do with it.
Daily shape compounds it. A school's load climbs from breakfast club, holds through the teaching day and falls away from about three in the afternoon, while generation is still strong until six in high summer. That is why we size against half hourly meter data rather than against annual consumption: the annual figure hides both problems.
A Clapham governing body should read that as a sizing constraint, not a reason to stop. The base load that runs through the holidays, servers, comms, refrigeration, ventilation and hot water, is the floor the array should be built up from, and everything above it has to be justified by storage, export or summer occupancy.
We set out the whole argument about term dates and the generation curve on the home page, and what it does to a payback figure under costs.
- generated while the school is open
- generated at a weekend or in the holidays
The same figures as a table
| Month | Session days | Output, kWh per kWp | School open | School closed |
|---|---|---|---|---|
| Jan | 20 | 25 | 16 | 9 |
| Feb | 15 | 38 | 20 | 18 |
| Mar | 21 | 73 | 49 | 24 |
| Apr | 12 | 105 | 42 | 63 |
| May | 17 | 120 | 66 | 54 |
| Jun | 21 | 124 | 87 | 37 |
| Jul | 11 | 126 | 45 | 81 |
| Aug | 0 | 106 | 0 | 106 |
| Sep | 20 | 83 | 55 | 28 |
| Oct | 17 | 52 | 29 | 23 |
| Nov | 21 | 31 | 22 | 9 |
| Dec | 15 | 22 | 11 | 11 |
| Year | 190 | 905 | 442 | 463 |
The school estate in Lambeth
Lambeth has 90 open state-funded schools and colleges on the DfE register teaching 32,746 pupils between them. Source: DfE Get Information About Schools.
The split is 61 primary, 16 secondary, 7 special and 6 further education, at an average of 364 pupils a site. A ratio of 3.8 to one tells you where the roof area is. It is not with the 61 primaries, which mostly offer a hall and a teaching block each, but with the larger sites that were built with a sports hall and a dining block attached.
Where a multi-academy trust holds several of those sites, surveying the estate in one pass beats taking a roof at a time. The design work, the connection applications and the procurement paperwork are the same job repeated, and a trust that runs them together gets a better answer on all three.
Grid connection through UK Power Networks
Connections around Clapham are handled by UK Power Networks, which sets the export limit for the site. Above 3.68 kW per phase the connection runs under G99, so the export limit is agreed in advance rather than assumed. Where the local network is constrained, an export-limited connection usually still makes the scheme work, because a school uses most of what the roof makes during the working day.
Send us the school postcode
A survey in Clapham starts with three things from you. Give us the postcode, the approximate roof area and, if you can get it from your supplier, twelve months of half hourly readings. What comes back is a usable area figure per block, output modelled against your own load rather than an average, and the ways a Clapham school can pay for it.
Lenzie Consulting Ltd arranges the survey and passes your details to an MCS-certified installation partner so they can quote. We do not carry out the installation ourselves.
What Clapham trusts ask before a survey
- What would a 360 kWp array produce at a Clapham school?
- Yes, and the figure matters more than the sunshine. 906 kWh per kWp a year puts a 360 kWp array at around 326,200 kWh, on roughly 1,069 square metres of roof. The value of that depends on your term time load. Source: EU PVGIS v5.2, SARAH3, 10 degree pitch, 14 percent system loss.
- What happens to the electricity during the summer holidays in Clapham?
- Less is wasted than governors expect, but the figure is worth seeing: 25.6 percent of the year is modelled to arrive in July and August here (EU PVGIS v5.2), against a site running on holiday base load. Lettings, holiday clubs and summer works take some of it, storage takes more, and the rest is an export question for UK Power Networks.
- Who do we apply to for export near Clapham?
- Only UK Power Networks can answer it for your connection. What we can say is that a capped export limit rarely breaks a school scheme, because the array that suits a school is sized to the term time load rather than to the roof.
- How many schools are there around Clapham?
- Lambeth has 90 open state-funded schools and colleges on the DfE register, with 32,746 pupils on roll. Source: DfE Get Information About Schools. We survey across the whole of that area, and where a trust holds several sites we look at them in one pass.