Specialist solar panels for schools in Derby

A 490 kWp array at Landau Forte College, Fox Street is the nearest school scheme on the planning record, and it is with the planning authority. We arrange the roof survey, model the output against the school's own half hourly consumption, and set out the funding routes.

862 kWh per kWp a year at this latitude, so a 490 kWp array, the median size schools around Derby have applied for, models at about 422,400 kWh. Source: EU PVGIS v5.2, SARAH3, 10 degree pitch, 14 percent system loss.

Book a roof survey in Derby
playing field 4 1 2 3 no array pending structural assessment 0 40 m N
  1. 1 teaching block
  2. 2 hall and kitchen
  3. 3 sports hall
  4. 4 1960s block, no array
  5. first phase
  6. later phase
Drawing Typical school site, Derby scale
Blocks 4, 3 with array
Array about 345 kWp
Yield about 297,000 kWh/yr
Frontage about 90 m / Rev A / DE1

Illustrative layout for an estate of this size. The array is drawn at about 345 kWp, roughly 53 percent of the 650 kWp these three roofs would hold, because a school sizes to the load it can use in term time rather than to the roof it has: generation it cannot use is exported at a much lower rate than it pays to import. The hatched block carries no array because its structure has not been assessed, which on a school of that era is the usual starting point rather than an exception. Your own figures, and which of your blocks can take an array, come from the roof survey.

Derby / Derbyshire
A school on the edge of a Midlands town, solar arrays on its roofs and flat open farmland beyond
School buildings of the kind we survey across East Midlands. Not a named school and not our work.

Which schools around DE1 have applied

The Renewable Energy Planning Database records 1 school and college solar scheme in the DE1 postcode district. A college, Landau Forte College, Fox Street, applied for 490 kWp roof mounted and the scheme is with the planning authority. The applicant on record is eEnergy Group PLC.

None of these are ours. They are entries in the public planning record, reproduced here because a consented array at a school down the road is a better guide to your own prospects than any national average. Source: Renewable Energy Planning Database, Q1 2026.

One thing to be clear about: the drawing at the head of this page is an illustrative estate, not Landau Forte College, Fox Street and not a survey of anyone's roof. What we know about the scheme above is only what the public planning record says.

The median array applied for here is 490 kWp. At 490 kWp you are covering roughly 1,455 square metres of roof once walkways, edge zones and rooflight setbacks come out, which on most sites means a sports hall plus one teaching block rather than the whole estate.

Every one of them is a college, which is worth knowing: a college runs longer days and more plant than a school, and it usually has the flat roof area to match.

Site on record Applicant on record Size Mounting Status
Landau Forte College, Fox Street eEnergy Group PLC 490 kWp Roof Application Submitted

Solar for education buildings across Derbyshire

A one kilowatt-peak array on a shallow pitched roof in Derby models at 862 kWh a year, from modelled irradiation of 1,100 kWh per square metre in the plane of the array (EU PVGIS v5.2, SARAH3, 10 degree pitch, 14 percent system loss). That is about 3 percent below the mean across the towns we cover, which is a smaller gap than most schools expect and smaller than the gap between a well matched and a badly matched system.

Scaled up, a 490 kWp array, sized to the median array applied for at schools around Derby itself, models at about 422,400 kWh a year before shading, and needs roughly 1,455 square metres of clear roof. That size is not one we chose. It is what schools in this district have actually applied for.

Spread across the year that is about 109,000 kWh landing in July and August and roughly 20,700 kWh across December and January. National Grid Electricity Distribution sets what may go back onto the network here, so the July figure is the one worth putting in front of a governing body first.

FIG. 1 Derby against the rest of Derbyshire
  • Long Eaton866
  • Derby862
  • Swadlincote856
  • Ilkeston855
  • Belper850
  • Matlock844
  • Chesterfield843
  • Buxton805

Derby ranks 2 of 8 towns we cover in Derbyshire on modelled yield, against a national mean of 886 kWh per kWp. The county runs from 805 to 866, a spread of 61 kWh per kWp. On a 500 kWp array that is about 30,500 kWh a year between the strongest and weakest town in the county.

Bars are zero based, so length is proportional to the figure. Where a county is flat, that is the finding: latitude is not the lever, the timetable is. Source: EU PVGIS v5.2, modelled per town

Term dates against the Derby generation curve

A Derby school roof generates most in the weeks its buildings are closed. 25.8 percent of the modelled year lands in July and August alone (EU PVGIS v5.2), and the summer holiday takes roughly six of those nine weeks out of the timetable. July is the single strongest month here at 13.9 percent of the annual total, and it falls almost entirely inside the holiday.

Winter reverses it. December and January between them return 4.9 percent of the modelled year, and that is when the heating, the lighting and a full register are all drawing at the same time. The roof makes 6 times as much in July as it does in December, and August alone outproduces December by about 5.2 to one. 74 percent of the year arrives between April and September, and the point of that figure is not that the summer half goes unused, because April, May and June are full teaching months that draw hard. It is that the concentration peaks in the few weeks at the end of it when the building is shut.

Nationally this comes out at about 49 percent of annual generation falling on a session day. A business open every weekday sees roughly 71 percent. The 22 point gap is what a school appraisal has to absorb, and it is much the same in Derby as anywhere else.

The daily curve does the same thing in miniature. Load drops sharply after about three o'clock, generation does not, so the last three hours of a summer afternoon are pushing into an empty building unless something absorbs them. Half hourly meter data is the only way to see how much.

The conclusion is not that a Derby school should do nothing. It is that the array should be sized to the load that survives the holidays, which is usually the server room, the catering refrigeration, the ventilation and the hot water, plus whatever the site lets out over the summer. Anything above that line needs storage or an export agreement with National Grid Electricity Distribution to earn its keep.

We set out the complete version of the term time arithmetic on the home page, and what it does to a payback figure under costs.

FIG. 2 A Derby roof against the English school year
0 30 60 90 120 Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec kWh August: nobody in the building
  • generated while the school is open
  • generated at a weekend or in the holidays
The same figures as a table
Monthly output for a 1 kWp array in Derby, split by whether the day is a school session day. Across the year 49 percent of generation lands while the school is open.
Month Session days Output, kWh per kWp School open School closed
Jan 20 22 14 8
Feb 15 36 19 17
Mar 21 71 48 23
Apr 12 100 40 60
May 17 119 65 54
Jun 21 117 82 35
Jul 11 120 43 77
Aug 0 103 0 103
Sep 20 79 53 26
Oct 17 48 26 22
Nov 21 28 20 8
Dec 15 20 10 10
Year 190 863 420 443
Output per kWp installed, split by whether the day is a session day. July and August are 25.8 percent of the Derby year and the school is shut for most of them. Each month's total is spread evenly across its days, which is the only split available without half hourly readings. Session days follow a typical English school year of 190 days. Your own trust or authority may differ by a few days either way. Source: EU PVGIS v5.2, session days from a typical school calendar

Derby schools, phase by phase

Derby has 104 open state-funded schools and colleges on the DfE register teaching 45,862 pupils between them. Source: DfE Get Information About Schools.

The split is 81 primary, 16 secondary, 6 special and 1 further education, at an average of 441 pupils a site. A ratio of 5.1 to one tells you where the roof area is. It is not with the 81 primaries, which mostly offer a hall and a teaching block each, but with the larger sites that were built with a sports hall and a dining block attached.

Where a multi-academy trust holds several of those sites, surveying the estate in one pass beats taking a roof at a time. The design work, the connection applications and the procurement paperwork are the same job repeated, and a trust that runs them together gets a better answer on all three.

Aerial view of a school site with teaching blocks of several different ages, a sports hall and a playing field, solar arrays on two of the flat roofs
A school site with blocks of several ages, which is the usual starting point for a trust estate survey.

Grid connection through National Grid Electricity Distribution

Connections around Derby are handled by National Grid Electricity Distribution, which sets the export limit for the site. Above 3.68 kW per phase the connection runs under G99, so the export limit is agreed in advance rather than assumed. Where the local network is constrained, an export-limited connection usually still makes the scheme work, because a school uses most of what the roof makes during the working day.

Across Derbyshire the planning database records 144 solar schemes totalling 904 MW, of which 27 are operational (REPD Q1 2026).

Book the survey

Book a roof survey at your Derby school

A survey in Derby starts with three things from you. Give us the postcode, the approximate roof area and, if you can get it from your supplier, twelve months of half hourly readings. What comes back is a usable area figure per block, output modelled against your own load rather than an average, and the ways a Derby school can pay for it.

Lenzie Consulting Ltd arranges the survey and passes your details to an MCS-certified installation partner so they can quote. We do not carry out the installation ourselves.

We pass your details to our MCS-certified installation partner so they can quote. Read the privacy notice.

Derby school solar, answered

How much would a school roof near Derby generate?
Modelled at 862 kWh per kWp a year, a 490 kWp array on a Derby school models at about 422,400 kWh. What decides whether that is worth doing is how much of it the school uses itself, not the total. Source: EU PVGIS v5.2, SARAH3, 10 degree pitch, 14 percent system loss.
How does the school year affect a solar scheme in Derby?
It goes somewhere, just not into the timetable. 25.8 percent of the Derby generating year lands in July and August (EU PVGIS v5.2), and a closed school still runs servers, comms, refrigeration and ventilation. What that base load does not absorb is either stored, exported under an agreement with National Grid Electricity Distribution, or a sign the array is too big. We test which before sizing anything.
Which network operator handles the connection at a Derby school?
Applications go to National Grid Electricity Distribution, who run the network across Derbyshire. An export-limited offer usually still works for a school, because the summer surplus is the part you were least likely to be paid much for anyway.
What does Derby require for solar on a school building?
Roof-mounted solar on a non-domestic building often falls within permitted development under Part 14 of the General Permitted Development Order, subject to limits on how far the panels stand proud of the roof plane and, above a threshold, to prior approval from Derby on siting and design. Listed buildings and conservation areas are the usual exceptions. We put the position to Derby before a design is finalised.
Has a school near DE1 already done this?
One school scheme is on record in this postcode district, including a 490 kWp array at Landau Forte College, Fox Street that is with the planning authority. We were not involved in it. It is a public planning record, and it matters less as proof that solar works than as evidence of what this authority and this network operator have already accepted. Source: Renewable Energy Planning Database, Q1 2026.
How many schools are there around Derby?
Derby has 104 open state-funded schools and colleges on the DfE register, with 45,862 pupils on roll. Source: DfE Get Information About Schools. We survey across the whole of that area, and where a trust holds several sites we look at them in one pass.