Solar panels for schools across Derbyshire
We survey school and college roofs throughout Derbyshire, model what each one carries against the school's own consumption, and arrange the design, the grid application and the installation through an MCS-certified partner.
- Schools and colleges
- 431
- 127,109 pupils, DfE Get Information About Schools
- Modelled yield
- 848 kWh/kWp/yr
- Mean across Derbyshire towns, EU PVGIS v5.2
- School solar on record
- 2 schemes
- Renewable Energy Planning Database Q1 2026, in 2 of the towns we cover
- Network operator
- National Grid Electricity Distribution
- G99 applications and export limits
- Towns covered
- 8
- Surveys arranged county wide
The school estate in Derbyshire
Derbyshire has 431 open state-funded schools and colleges teaching 127,109 pupils, spread across 7 local authorities. Source: DfE Get Information About Schools.
Of those, 361 primary, 53 secondary, 15 special and 2 further education. The phase mix is what sets the usable roof area across a county: secondary sites and colleges carry the sports halls, dining blocks and flat roofs, while primaries offer a hall and a teaching block each and suit arrays sized to the base load.
School rooftop solar and what a Derbyshire roof models
Modelled yield is not flat across Derbyshire. Long Eaton comes out at 866 kWh per kWp a year against 805 at Buxton, a spread of 61 kWh per kWp. On a 345 kWp school array that difference is about 21,045 kWh a year, which is worth checking before anyone accepts a county-wide saving figure. Source: EU PVGIS v5.2.
Every town page below carries the same arithmetic for that town, including the share of the year that lands in July and August, which is the number a governing body should see before a saving figure.
Solar PV for academy trusts on the Derbyshire planning record
The Renewable Energy Planning Database records 2 school and college solar schemes in Derbyshire, across 2 of the towns we cover. They include Landau Forte College, Fox Street at Derby and Anthony Gell School, Wood Street at Matlock. The median array applied for is 345 kWp.
We were not involved in any of those schemes. They are public planning records, and they are here because what a local authority and a network operator have already accepted for one school is the best available guide to what they will accept for the next. Source: Renewable Energy Planning Database, Q1 2026.
Connections across the county run through National Grid Electricity Distribution. Anything above 3.68 kW per phase needs a G99 application, and on a school site the incoming supply and the size of the existing main switchboard are often the real constraint rather than the roof.
- Derby 1 on record
- Chesterfield 843 kWh/kWp
- Ilkeston 855 kWh/kWp
- Long Eaton 866 kWh/kWp
- Swadlincote 856 kWh/kWp
- Buxton 805 kWh/kWp
- Belper 850 kWh/kWp
- Matlock 1 on record
Book a roof survey at a Derbyshire school
Send the school postcode and the rough roof area, with half hourly meter data if the trust holds it. We come back with what the roofs carry, what they generate against the timetable rather than against an annual average, and how schools pay for it.
Lenzie Consulting Ltd arranges the survey and introduces an MCS-certified installation partner. We do not install, and nothing on this page is a guarantee of a saving.