Specialist solar panels for schools in Melksham

What decides a solar scheme at a Melksham school is how much of the output the site uses itself, not how much the roof makes. We arrange the roof survey, model the output against the school's own half hourly consumption, and set out the funding routes.

291,800 kWh a year, modelled for a 320 kWp array on roughly 950 sqm of clear roof. That is the size applied for at the nearest school scheme on record. Source: EU PVGIS v5.2, SARAH3, 10 degree pitch, 14 percent system loss.

Book a roof survey in Melksham
playing field 4 1 2 3 no array pending structural assessment 0 40 m N
  1. 1 teaching block
  2. 2 hall and kitchen
  3. 3 sports hall
  4. 4 1960s block, no array
  5. first phase
  6. later phase
Drawing Illustrative estate, not a Melksham school
Blocks 4, 3 with array
Array about 345 kWp
Yield about 315,000 kWh/yr
Frontage about 90 m / Rev A / SN12

Illustrative layout for an estate of this size. The array is drawn at about 345 kWp, roughly 53 percent of the 650 kWp these three roofs would hold, because a school sizes to the load it can use in term time rather than to the roof it has: generation it cannot use is exported at a much lower rate than it pays to import. The hatched block carries no array because its structure has not been assessed, which on a school of that era is the usual starting point rather than an exception. Your own figures, and which of your blocks can take an array, come from the roof survey.

Melksham / Wiltshire
A school on the edge of a South West market town, solar arrays on its roofs and rolling farmland beyond
School buildings of the kind we survey across South West. Not a named school and not our work.

Solar for education buildings across Wiltshire

A one kilowatt-peak array on a shallow pitched roof in Melksham models at 912 kWh a year, from modelled irradiation of 1,166 kWh per square metre in the plane of the array (EU PVGIS v5.2, SARAH3, 10 degree pitch, 14 percent system loss). That is roughly 3 percent above the mean across the towns we cover, so latitude is working slightly in your favour here.

Scaled up, a 320 kWp array, sized to what the nearest school scheme on record applied for, 6 miles away at Chippenham, models at about 291,800 kWh a year before shading, and needs roughly 950 square metres of clear roof. We take the size from the nearest real application rather than a round number, so the example is anchored to something a planning officer has already seen.

Spread across the year that is about 74,400 kWh landing in July and August and roughly 14,900 kWh across December and January. Scottish and Southern Electricity Networks sets what may go back onto the network here, so the July figure is the one worth putting in front of a governing body first.

FIG. 1 Melksham against the rest of Wiltshire
  • Salisbury923
  • Melksham912
  • Warminster912
  • Trowbridge909
  • Devizes906
  • Marlborough900
  • Swindon899
  • Chippenham894

Melksham ranks 2 of 8 towns we cover in Wiltshire on modelled yield, against a national mean of 886 kWh per kWp. The county runs from 894 to 923, a spread of 29 kWh per kWp. Within Wiltshire that difference is small enough to ignore: where the building sits is not what decides this scheme, your consumption pattern is.

Bars are zero based, so length is proportional to the figure. Where a county is flat, that is the finding: latitude is not the lever, the timetable is. Source: EU PVGIS v5.2, modelled per town

School solar on record near SN12

There is no school entry for the SN12 postcode district in the Renewable Energy Planning Database. The register is dependable for anything from a megawatt upward and incomplete below it, and a school array is usually nearer a fifth of a megawatt, so this says more about the threshold than about Melksham.

Look 6 miles out and there is one: Wiltshire College, Lackham in Chippenham, 320 kWp, applied for by Wessex Energy Solutions, which holds consent and is awaiting construction. None of our doing. It is a public planning record, and the nearest evidence available of how an application like yours is treated around here. Source: Renewable Energy Planning Database, Q1 2026.

Term dates against the Melksham generation curve

A Melksham school roof generates most in the weeks its buildings are closed. 25.5 percent of the modelled year lands in July and August alone (EU PVGIS v5.2), and the summer holiday takes roughly six of those nine weeks out of the timetable. July is the single strongest month here at 13.8 percent of the annual total, and it falls almost entirely inside the holiday.

Winter reverses it. December and January between them return 5.1 percent of the modelled year, and that is when the heating, the lighting and a full register are all drawing at the same time. The roof makes 6 times as much in July as it does in December, and August alone outproduces December by about 5 to one. 74 percent of the year arrives between April and September, and the point of that figure is not that the summer half goes unused, because April, May and June are full teaching months that draw hard. It is that the concentration peaks in the few weeks at the end of it when the building is shut.

Nationally this comes out at about 49 percent of annual generation falling on a session day. A business open every weekday sees roughly 71 percent. The 22 point gap is what a school appraisal has to absorb, and it is much the same in Melksham as anywhere else.

And the week has the same hole in it. Two days in seven the site is closed altogether, at no cost to the generation, which is part of why the session day share sits where it does. Weekend lettings are the one lever a Melksham school has over that, and they are worth counting properly.

The conclusion is not that a Melksham school should do nothing. It is that the array should be sized to the load that survives the holidays, which is usually the server room, the catering refrigeration, the ventilation and the hot water, plus whatever the site lets out over the summer. Anything above that line needs storage or an export agreement with Scottish and Southern Electricity Networks to earn its keep.

We set out the whole argument about term dates and the generation curve on the home page, and what it does to a payback figure under costs.

FIG. 2 A Melksham roof against the English school year
0 35 70 105 140 Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec kWh August: nobody in the building
  • generated while the school is open
  • generated at a weekend or in the holidays
The same figures as a table
Monthly output for a 1 kWp array in Melksham, split by whether the day is a school session day. Across the year 49 percent of generation lands while the school is open.
Month Session days Output, kWh per kWp School open School closed
Jan 20 25 16 9
Feb 15 39 21 18
Mar 21 75 51 24
Apr 12 106 42 64
May 17 123 67 56
Jun 21 125 88 38
Jul 11 126 45 81
Aug 0 106 0 106
Sep 20 83 55 28
Oct 17 51 28 23
Nov 21 30 21 9
Dec 15 21 10 11
Year 190 910 444 466
Per kWp installed, month by month, separating generation while the school is open from generation at a weekend or in the holidays. 74 percent of the Melksham year sits between April and September, most of which is term time; it is the tail of that period, the last week of July and all of August, that the school is not there for. The daily split is a flat apportionment of each month, not a metered one. Session days follow a typical English school year of 190 days. Your own trust or authority may differ by a few days either way. Source: EU PVGIS v5.2, session days from a typical school calendar

Wiltshire schools, phase by phase

Wiltshire has 237 open state-funded schools and colleges on the DfE register teaching 68,445 pupils between them. Source: DfE Get Information About Schools.

The split is 201 primary, 28 secondary, 6 special and 2 further education, at an average of 289 pupils a site. A ratio of 7.2 to one tells you where the roof area is. It is not with the 201 primaries, which mostly offer a hall and a teaching block each, but with the larger sites that were built with a sports hall and a dining block attached.

Where a multi-academy trust holds several of those sites, surveying the estate in one pass beats taking a roof at a time. The design work, the connection applications and the procurement paperwork are the same job repeated, and a trust that runs them together gets a better answer on all three.

Aerial view of a school site with teaching blocks of several different ages, a sports hall and a playing field, solar arrays on two of the flat roofs
A school site with blocks of several ages, which is the usual starting point for a trust estate survey.

Grid connection through Scottish and Southern Electricity Networks

Scottish and Southern Electricity Networks operates the distribution network across Wiltshire, so the export application goes to them. Anything larger than 3.68 kW per phase falls under G99, which means an application before commissioning rather than a notification afterwards. A constrained network is not the end of a scheme. Capping export costs little when the building already absorbs most of what the roof produces.

Across Wiltshire the planning database records 159 solar schemes totalling 1585 MW, of which 56 are operational (REPD Q1 2026).

Book the survey

Book a roof survey at your Melksham school

We survey school and college roofs throughout Wiltshire. We need the postcode, a rough roof area and your half hourly meter data if the trust has it. From that we model what the roof carries, what it generates against the timetable, and which of the funding routes actually suits a school of your size.

Lenzie Consulting Ltd arranges the survey and passes your details to an MCS-certified installation partner so they can quote. We do not carry out the installation ourselves.

We pass your details to our MCS-certified installation partner so they can quote. Read the privacy notice.

Melksham school solar, answered

Is there enough sun around Melksham for this to be worth doing?
The model gives 912 kWh a year for every kWp installed at this latitude, so a 320 kWp array comes out at roughly 291,800 kWh a year before shading. It needs about 950 square metres of clear roof once walkways and rooflight setbacks are allowed for. Source: EU PVGIS v5.2, SARAH3, 10 degree pitch, 14 percent system loss.
Does a Melksham school waste its generation in August?
25.5 percent of the modelled annual output for Melksham falls in July and August, when the buildings are closed for most of six weeks (EU PVGIS v5.2). It does not go to waste, but it only has three places to go: the base load that runs regardless, such as servers, catering refrigeration and ventilation; storage; or export under an agreement with Scottish and Southern Electricity Networks. We model all three against your half hourly data before an array is sized.
Will the network around Melksham accept the export?
Scottish and Southern Electricity Networks is the distribution network operator for Wiltshire. Anything above 3.68 kW per phase connects under G99, and the application fixes the export limit. On a school site the incoming supply is often the binding constraint rather than the roof, so we ask that question before anyone sizes an array.
Is planning permission needed for panels on a school in Melksham?
Usually permitted development covers a roof array on a school, with prior approval from Wiltshire needed above a capacity threshold. A ground mounted array in the grounds is a different question and much more likely to need a full application. We check both before design sign-off.
How many schools are there around Melksham?
Wiltshire has 237 open state-funded schools and colleges on the DfE register, with 68,445 pupils on roll. Source: DfE Get Information About Schools. We survey across the whole of that area, and where a trust holds several sites we look at them in one pass.

Nearby