Solar panels for schools across Wiltshire
We survey school and college roofs throughout Wiltshire, model what each one carries against the school's own consumption, and arrange the design, the grid application and the installation through an MCS-certified partner.
- Schools and colleges
- 325
- 105,019 pupils, DfE Get Information About Schools
- Modelled yield
- 907 kWh/kWp/yr
- Mean across Wiltshire towns, EU PVGIS v5.2
- School solar on record
- 1 scheme
- Renewable Energy Planning Database Q1 2026, in 1 of the towns we cover
- Network operator
- Scottish and Southern Electricity Networks
- G99 applications and export limits
- Towns covered
- 8
- Surveys arranged county wide
The school estate in Wiltshire
Wiltshire has 325 open state-funded schools and colleges teaching 105,019 pupils, spread across 2 local authorities. Source: DfE Get Information About Schools.
Of those, 267 primary, 42 secondary, 13 special and 3 further education. The phase mix is what sets the usable roof area across a county: secondary sites and colleges carry the sports halls, dining blocks and flat roofs, while primaries offer a hall and a teaching block each and suit arrays sized to the base load.
School rooftop solar and what a Wiltshire roof models
Modelled yield is not flat across Wiltshire. Salisbury comes out at 923 kWh per kWp a year against 894 at Chippenham, a spread of 29 kWh per kWp. On a 320 kWp school array that difference is about 9,280 kWh a year, which is worth checking before anyone accepts a county-wide saving figure. Source: EU PVGIS v5.2.
Every town page below carries the same arithmetic for that town, including the share of the year that lands in July and August, which is the number a governing body should see before a saving figure.
Solar PV for academy trusts on the Wiltshire planning record
The Renewable Energy Planning Database records 1 school and college solar scheme in Wiltshire, at Chippenham. It is Wiltshire College, Lackham, applied for by Wessex Energy Solutions. The median array applied for is 320 kWp.
We were not involved in that scheme. It is a public planning record, and it is here because what a local authority and a network operator have already accepted for one school is the best available guide to what they will accept for the next. Source: Renewable Energy Planning Database, Q1 2026.
Connections across the county run through Scottish and Southern Electricity Networks. Anything above 3.68 kW per phase needs a G99 application, and on a school site the incoming supply and the size of the existing main switchboard are often the real constraint rather than the roof.
- Swindon 899 kWh/kWp
- Salisbury 923 kWh/kWp
- Trowbridge 909 kWh/kWp
- Chippenham 1 on record
- Devizes 906 kWh/kWp
- Melksham 912 kWh/kWp
- Warminster 912 kWh/kWp
- Marlborough 900 kWh/kWp
Book a roof survey at a Wiltshire school
Send the school postcode and the rough roof area, with half hourly meter data if the trust holds it. We come back with what the roofs carry, what they generate against the timetable rather than against an annual average, and how schools pay for it.
Lenzie Consulting Ltd arranges the survey and introduces an MCS-certified installation partner. We do not install, and nothing on this page is a guarantee of a saving.