schoolsolarpanels Solar for schools and academy trusts Book a roof survey

Specialist solar panels for schools in Harlow

Harlow has 40 state-funded schools and colleges, and most of them are buying electricity in exactly the hours their own roofs could be making it. We start with the roof build up and the age of the covering, because across a school estate that is usually what decides which block goes first.

263,300 kWh a year, modelled for a 290 kWp array on roughly 861 sqm of clear roof. That is the size applied for at the nearest school scheme on record. Source: EU PVGIS v5.2, SARAH3, 10 degree pitch, 14 percent system loss.

Book a roof survey in Harlow
playing field 4 1 2 3 no array pending structural assessment 0 40 m N
  1. 1 teaching block
  2. 2 hall and kitchen
  3. 3 sports hall
  4. 4 1960s block, no array
  5. first phase
  6. later phase
Drawing Illustrative estate, not a Harlow school
Blocks 4, 3 with array
Array about 345 kWp
Yield about 313,000 kWh/yr
Frontage about 90 m / Rev A / CM20

Illustrative layout for an estate of this size. The array is drawn at about 345 kWp, roughly 53 percent of the 650 kWp these three roofs would hold, because a school sizes to the load it can use in term time rather than to the roof it has: generation it cannot use is exported at a much lower rate than it pays to import. The hatched block carries no array because its structure has not been assessed, which on a school of that era is the usual starting point rather than an exception. Your own figures, and which of your blocks can take an array, come from the roof survey.

Harlow / Essex
A school on the edge of an eastern commuter town, solar arrays on its roofs and wooded low hills beyond
School buildings of the kind we survey across East of England. Not a named school and not our work.

Solar for education buildings across Essex

A one kilowatt-peak array on a shallow pitched roof in Harlow models at 908 kWh a year, from modelled irradiation of 1,164 kWh per square metre in the plane of the array (EU PVGIS v5.2, SARAH3, 10 degree pitch, 14 percent system loss). Harlow models 2 percent above our mean. That is a real advantage, though a smaller one than the difference between an array matched to the timetable and one matched to the roof.

Scaled up, a 290 kWp array, sized to what the nearest school scheme on record applied for, 7 miles away at Bishop's Stortford, models at about 263,300 kWh a year before shading, and needs roughly 861 square metres of clear roof. We take the size from the nearest real application rather than a round number, so the example is anchored to something a planning officer has already seen.

Spread across the year that is about 67,400 kWh landing in July and August and roughly 13,700 kWh across December and January. UK Power Networks sets what may go back onto the network here, so the July figure is the one worth putting in front of a governing body first.

FIG. 1 Harlow against the rest of Essex
  • Colchester953
  • Canvey Island945
  • Southend-on-Sea942
  • Basildon933
  • Braintree932
  • Chelmsford930
  • Grays927
  • Brentwood913
  • Harlow908

Harlow ranks 10 of 10 towns we cover in Essex on modelled yield, against a national mean of 886 kWh per kWp. The county runs from 908 to 973, a spread of 65 kWh per kWp. On a 500 kWp array that is about 32,500 kWh a year between the strongest and weakest town in the county.

Bars are zero based, so length is proportional to the figure. Where a county is flat, that is the finding: latitude is not the lever, the timetable is. Source: EU PVGIS v5.2, modelled per town

School solar on record near CM20

The Renewable Energy Planning Database holds no school scheme for the CM20 postcode district. Read that as a gap in the record, not a gap in the roofs: the database is reliable above one megawatt and thin below it, and a school array is typically a fifth of a megawatt.

Look 7 miles out and there is one: Hockerill Anglo European College, Dunmow Road in Bishop's Stortford, 290 kWp, applied for by Solar Options for Schools Limited, which is with the planning authority. None of our doing. It is a public planning record, and the nearest evidence available of how an application like yours is treated around here. Source: Renewable Energy Planning Database, Q1 2026.

Term dates against the Harlow generation curve

A Harlow school roof generates most in the weeks its buildings are closed. 25.6 percent of the modelled year lands in July and August alone (EU PVGIS v5.2), and the summer holiday takes roughly six of those nine weeks out of the timetable. July is the single strongest month here at 13.9 percent of the annual total, and it falls almost entirely inside the holiday.

Winter reverses it. December and January between them return 5.2 percent of the modelled year, and that is when the heating, the lighting and a full register are all drawing at the same time. The roof makes 5.7 times as much in July as it does in December, and August alone outproduces December by about 4.9 to one. 73 percent of the year arrives between April and September, and the point of that figure is not that the summer half goes unused, because April, May and June are full teaching months that draw hard. It is that the concentration peaks in the few weeks at the end of it when the building is shut.

Across the country the arithmetic settles at roughly 49 percent of output on a session day, against about 71 percent for a weekday business. That figure hardly varies by location, which is why the local numbers that matter here are the yield, the roofs and what has already cleared planning nearby.

The same mismatch repeats every day. Peak generation lands between eleven and three, the timetable ends shortly after, and by four the site is down to caretaking and cleaning. An annual consumption figure cannot show that, which is why we ask for the half hourly data instead.

That argues for a particular shape of scheme rather than against one. Size to the load that does not stop at the end of term, count in lettings, holiday clubs and summer works honestly rather than optimistically, and then decide whether storage or an export arrangement with UK Power Networks pays for the surplus that is left.

We set out the whole argument about term dates and the generation curve on the home page, and what it does to a payback figure under costs.

FIG. 2 A Harlow roof against the English school year
0 35 70 105 140 Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec kWh August: nobody in the building
  • generated while the school is open
  • generated at a weekend or in the holidays
The same figures as a table
Monthly output for a 1 kWp array in Harlow, split by whether the day is a school session day. Across the year 49 percent of generation lands while the school is open.
Month Session days Output, kWh per kWp School open School closed
Jan 20 25 16 9
Feb 15 39 21 18
Mar 21 74 50 24
Apr 12 105 42 63
May 17 120 66 54
Jun 21 125 88 38
Jul 11 126 45 81
Aug 0 107 0 107
Sep 20 84 56 28
Oct 17 52 29 23
Nov 21 30 21 9
Dec 15 22 11 11
Year 190 909 445 464
Per kWp installed, month by month, separating generation while the school is open from generation at a weekend or in the holidays. 73 percent of the Harlow year sits between April and September, most of which is term time; it is the tail of that period, the last week of July and all of August, that the school is not there for. The daily split is a flat apportionment of each month, not a metered one. Session days follow a typical English school year of 190 days. Your own trust or authority may differ by a few days either way. Source: EU PVGIS v5.2, session days from a typical school calendar

Grid connection through UK Power Networks

Connections around Harlow are handled by UK Power Networks, which sets the export limit for the site. Above 3.68 kW per phase the connection runs under G99, so the export limit is agreed in advance rather than assumed. Where the local network is constrained, an export-limited connection usually still makes the scheme work, because a school uses most of what the roof makes during the working day.

Across Essex the planning database records 221 solar schemes totalling 2787 MW, of which 46 are operational (REPD Q1 2026).

Harlow schools, phase by phase

Harlow has 40 open state-funded schools and colleges on the DfE register teaching 15,812 pupils between them. Source: DfE Get Information About Schools.

The split is 30 primary, 7 secondary, 2 special and 1 further education, at an average of 395 pupils a site. That is 4.3 primaries for every secondary, which is the ratio that matters for a roof: a primary of a few hundred pupils usually offers a hall roof and one teaching block, while a secondary site carries a sports hall, a dining block and several flat roofs.

If your trust holds several of them, the sequencing question comes before the sizing question. Roof age, covering type and the state of the incoming supply vary block by block across an estate, and that is normally what sets the order of works.

Aerial view of a school site with teaching blocks of several different ages, a sports hall and a playing field, solar arrays on two of the flat roofs
A school site with blocks of several ages, which is the usual starting point for a trust estate survey.
Book the survey

Book a roof survey at your Harlow school

A survey in Harlow starts with three things from you. Give us the postcode, the approximate roof area and, if you can get it from your supplier, twelve months of half hourly readings. What comes back is a usable area figure per block, output modelled against your own load rather than an average, and the ways a Harlow school can pay for it.

Lenzie Consulting Ltd arranges the survey and passes your details to an MCS-certified installation partner so they can quote. We do not carry out the installation ourselves.

We pass your details to our MCS-certified installation partner so they can quote. Read the privacy notice.

Harlow school solar, answered

How much would a school roof near Harlow generate?
Modelled at 908 kWh per kWp a year, a 290 kWp array on a Harlow school models at about 263,300 kWh. What decides whether that is worth doing is how much of it the school uses itself, not the total. Source: EU PVGIS v5.2, SARAH3, 10 degree pitch, 14 percent system loss.
How does the school year affect a solar scheme in Harlow?
It goes somewhere, just not into the timetable. 25.6 percent of the Harlow generating year lands in July and August (EU PVGIS v5.2), and a closed school still runs servers, comms, refrigeration and ventilation. What that base load does not absorb is either stored, exported under an agreement with UK Power Networks, or a sign the array is too big. We test which before sizing anything.
Which network operator handles the connection at a Harlow school?
Applications go to UK Power Networks, who run the network across Essex. An export-limited offer usually still works for a school, because the summer surplus is the part you were least likely to be paid much for anyway.
What does Harlow require for solar on a school building?
Roof-mounted solar on a non-domestic building often falls within permitted development under Part 14 of the General Permitted Development Order, subject to limits on how far the panels stand proud of the roof plane and, above a threshold, to prior approval from Harlow on siting and design. Listed buildings and conservation areas are the usual exceptions. We put the position to Harlow before a design is finalised.
How many schools are there around Harlow?
Harlow has 40 open state-funded schools and colleges on the DfE register, with 15,812 pupils on roll. Source: DfE Get Information About Schools. We survey across the whole of that area, and where a trust holds several sites we look at them in one pass.

Nearby

All Essex locations