Specialist solar panels for schools in Brentwood
A school roof in Brentwood makes 5.8 times as much in July as it does in December, and the school year runs against that curve rather than with it. What we come back with is the usable roof area, the modelled output against your meter data, and the routes schools use to pay for it.
255,600 kWh a year, modelled for a 280 kWp array on roughly 832 sqm of clear roof. That is the size applied for at the nearest school scheme on record. Source: EU PVGIS v5.2, SARAH3, 10 degree pitch, 14 percent system loss.
Book a roof survey in Brentwood- 1 teaching block
- 2 hall and kitchen
- 3 sports hall
- 4 1960s block, no array
- first phase
- later phase
Illustrative layout for an estate of this size. The array is drawn at about 345 kWp, roughly 53 percent of the 650 kWp these three roofs would hold, because a school sizes to the load it can use in term time rather than to the roof it has: generation it cannot use is exported at a much lower rate than it pays to import. The hatched block carries no array because its structure has not been assessed, which on a school of that era is the usual starting point rather than an exception. Your own figures, and which of your blocks can take an array, come from the roof survey.
School rooftop solar across Essex
A one kilowatt-peak array on a shallow pitched roof in Brentwood models at 913 kWh a year, from modelled irradiation of 1,173 kWh per square metre in the plane of the array (EU PVGIS v5.2, SARAH3, 10 degree pitch, 14 percent system loss). That is roughly 3 percent above the mean across the towns we cover, so latitude is working slightly in your favour here.
Scaled up, a 280 kWp array, sized to what the nearest school scheme on record applied for, 14 miles away at Canvey Island, models at about 255,600 kWh a year before shading, and needs roughly 832 square metres of clear roof. We take the size from the nearest real application rather than a round number, so the example is anchored to something a planning officer has already seen.
Spread across the year that is about 65,400 kWh landing in July and August and roughly 13,000 kWh across December and January. UK Power Networks sets what may go back onto the network here, so the July figure is the one worth putting in front of a governing body first.
Brentwood ranks 9 of 10 towns we cover in Essex on modelled yield, against a national mean of 886 kWh per kWp. The county runs from 908 to 973, a spread of 65 kWh per kWp. On a 500 kWp array that is about 32,500 kWh a year between the strongest and weakest town in the county.
What the planning record shows around Brentwood
The Renewable Energy Planning Database holds no school scheme for the CM14 postcode district. Read that as a gap in the record, not a gap in the roofs: the database is reliable above one megawatt and thin below it, and a school array is typically a fifth of a megawatt.
The nearest education scheme on the record is 14 miles from Brentwood, at Canvey Island: 280 kWp at Castle View School, Foksville Road, applicant Castle View School, which holds consent and is awaiting construction. That is someone else's application, not ours, and it is here because it shows what Essex planning has already accepted at an education site. Source: Renewable Energy Planning Database, Q1 2026.
The summer holiday problem for a Brentwood school
25.6 percent of the annual output modelled for Brentwood arrives in the two months a school uses least (EU PVGIS v5.2). Term ends in the third week of July and the buildings stay largely empty until September. July is the single strongest month here at 13.9 percent of the annual total, and it falls almost entirely inside the holiday.
The inverse holds at the other end. December and January together return only 5.1 percent of the year, and those are the months with the heating, the lighting and the full timetable all running at once. The roof makes 5.8 times as much in July as it does in December, and August alone outproduces December by about 4.9 to one. 73 percent of the year arrives between April and September, and the point of that figure is not that the summer half goes unused, because April, May and June are full teaching months that draw hard. It is that the concentration peaks in the few weeks at the end of it when the building is shut.
Nationally this comes out at about 49 percent of annual generation falling on a session day. A business open every weekday sees roughly 71 percent. The 22 point gap is what a school appraisal has to absorb, and it is much the same in Brentwood as anywhere else.
And the week has the same hole in it. Two days in seven the site is closed altogether, at no cost to the generation, which is part of why the session day share sits where it does. Weekend lettings are the one lever a Brentwood school has over that, and they are worth counting properly.
The conclusion is not that a Brentwood school should do nothing. It is that the array should be sized to the load that survives the holidays, which is usually the server room, the catering refrigeration, the ventilation and the hot water, plus whatever the site lets out over the summer. Anything above that line needs storage or an export agreement with UK Power Networks to earn its keep.
We set out the whole argument about term dates and the generation curve on the home page, and what it does to a payback figure under costs.
- generated while the school is open
- generated at a weekend or in the holidays
The same figures as a table
| Month | Session days | Output, kWh per kWp | School open | School closed |
|---|---|---|---|---|
| Jan | 20 | 25 | 16 | 9 |
| Feb | 15 | 39 | 21 | 18 |
| Mar | 21 | 74 | 50 | 24 |
| Apr | 12 | 106 | 42 | 64 |
| May | 17 | 121 | 66 | 55 |
| Jun | 21 | 126 | 88 | 38 |
| Jul | 11 | 127 | 45 | 82 |
| Aug | 0 | 107 | 0 | 107 |
| Sep | 20 | 84 | 56 | 28 |
| Oct | 17 | 52 | 29 | 23 |
| Nov | 21 | 31 | 22 | 9 |
| Dec | 15 | 22 | 11 | 11 |
| Year | 190 | 914 | 446 | 468 |
How many schools Brentwood has
Brentwood has 31 open state-funded schools and colleges on the DfE register teaching 14,589 pupils between them. Source: DfE Get Information About Schools.
The split is 23 primary, 6 secondary and 2 special, at an average of 471 pupils a site. That is 3.8 primaries for every secondary, which is the ratio that matters for a roof: a primary of a few hundred pupils usually offers a hall roof and one teaching block, while a secondary site carries a sports hall, a dining block and several flat roofs.
If your trust holds several of them, the sequencing question comes before the sizing question. Roof age, covering type and the state of the incoming supply vary block by block across an estate, and that is normally what sets the order of works.
Grid connection through UK Power Networks
UK Power Networks is the network operator here, and their answer on export capacity shapes the design. Any commercial array above 3.68 kW per phase connects under G99 rather than G98, and the application fixes what you are allowed to push back onto the network. If the local network is tight, limiting export rarely breaks the case here: most of the generation is consumed on site while the building is working.
Across Essex the planning database records 221 solar schemes totalling 2787 MW, of which 46 are operational (REPD Q1 2026).
Start with the Brentwood roof
Roof condition decides the order of works on most school estates, so that is where we start. Send us the postcode and a rough roof area, with twelve months of half hourly readings if you have them, and we come back with usable area, modelled output against your own load, and the funding routes.
Lenzie Consulting Ltd arranges the survey and passes your details to an MCS-certified installation partner so they can quote. We do not carry out the installation ourselves.
Questions governors ask us about Brentwood schools
- What would a 280 kWp array produce at a Brentwood school?
- Yes, and the figure matters more than the sunshine. 913 kWh per kWp a year puts a 280 kWp array at around 255,600 kWh, on roughly 832 square metres of roof. The value of that depends on your term time load. Source: EU PVGIS v5.2, SARAH3, 10 degree pitch, 14 percent system loss.
- What happens to the electricity during the summer holidays in Brentwood?
- Less is wasted than governors expect, but the figure is worth seeing: 25.6 percent of the year is modelled to arrive in July and August here (EU PVGIS v5.2), against a site running on holiday base load. Lettings, holiday clubs and summer works take some of it, storage takes more, and the rest is an export question for UK Power Networks.
- Who do we apply to for export near Brentwood?
- Only UK Power Networks can answer it for your connection. What we can say is that a capped export limit rarely breaks a school scheme, because the array that suits a school is sized to the term time load rather than to the roof.
- Do we need planning permission in Brentwood?
- Often not, because panels on the roof of a school building usually sit within permitted development for non-domestic buildings. The exceptions are listed buildings, conservation areas and arrays that project too far above the roof plane, and larger schemes still need prior approval from Brentwood. We confirm it either way.
- How many schools are there around Brentwood?
- Brentwood has 31 open state-funded schools and colleges on the DfE register, with 14,589 pupils on roll. Source: DfE Get Information About Schools. We survey across the whole of that area, and where a trust holds several sites we look at them in one pass.