Specialist solar panels for schools in Droitwich

Wychavon has 61 state-funded schools and colleges, and most of them are buying electricity in exactly the hours their own roofs could be making it. We start with the roof build up and the age of the covering, because across a school estate that is usually what decides which block goes first.

412,200 kWh a year, modelled for a 470 kWp array on roughly 1,396 sqm of clear roof. That is the size applied for at the nearest school scheme on record. Source: EU PVGIS v5.2, SARAH3, 10 degree pitch, 14 percent system loss.

Book a roof survey in Droitwich
playing field 4 1 2 3 no array pending structural assessment 0 40 m N
  1. 1 teaching block
  2. 2 hall and kitchen
  3. 3 sports hall
  4. 4 1960s block, no array
  5. first phase
  6. later phase
Drawing Illustrative estate, not a Droitwich school
Blocks 4, 3 with array
Array about 345 kWp
Yield about 303,000 kWh/yr
Frontage about 90 m / Rev A / Worcestershire

Illustrative layout for an estate of this size. The array is drawn at about 345 kWp, roughly 53 percent of the 650 kWp these three roofs would hold, because a school sizes to the load it can use in term time rather than to the roof it has: generation it cannot use is exported at a much lower rate than it pays to import. The hatched block carries no array because its structure has not been assessed, which on a school of that era is the usual starting point rather than an exception. Your own figures, and which of your blocks can take an array, come from the roof survey.

Droitwich / Worcestershire
A two storey 1970s school block with a shallow pitched roof covered in solar panels, empty playground in front and a playing field beyond
School buildings of the kind we survey across Worcestershire. Not a named school and not our work.

Solar for education buildings across Worcestershire

A one kilowatt-peak array on a shallow pitched roof in Droitwich models at 877 kWh a year, from modelled irradiation of 1,126 kWh per square metre in the plane of the array (EU PVGIS v5.2, SARAH3, 10 degree pitch, 14 percent system loss). That puts Droitwich in the middle of the national range, close enough to our mean of 886 kWh per kWp that the interesting question moves straight to consumption.

Scaled up, a 470 kWp array, sized to what the nearest school scheme on record applied for, 17 miles away at Solihull, models at about 412,200 kWh a year before shading, and needs roughly 1,396 square metres of clear roof. We take the size from the nearest real application rather than a round number, so the example is anchored to something a planning officer has already seen.

Spread across the year that is about 105,500 kWh landing in July and August and roughly 20,200 kWh across December and January. National Grid Electricity Distribution sets what may go back onto the network here, so the July figure is the one worth putting in front of a governing body first.

FIG. 1 Droitwich against the rest of Worcestershire
  • Worcester882
  • Redditch877
  • Droitwich877
  • Evesham876
  • Malvern875
  • Bromsgrove872
  • Kidderminster866

Droitwich ranks 3 of 7 towns we cover in Worcestershire on modelled yield, against a national mean of 886 kWh per kWp. The county runs from 866 to 882, a spread of 16 kWh per kWp. Within Worcestershire that difference is small enough to ignore: where the building sits is not what decides this scheme, your consumption pattern is.

Bars are zero based, so length is proportional to the figure. Where a county is flat, that is the finding: latitude is not the lever, the timetable is. Source: EU PVGIS v5.2, modelled per town

School solar on record near Droitwich

No school or college solar scheme appears in Droitwich and the area around it in the Renewable Energy Planning Database. That is a reporting threshold rather than a verdict. The database records generating stations from one megawatt upward reliably and smaller ones patchily, and almost every school array is a fraction of that, so a roof full of panels on a Droitwich secondary could be generating today without ever reaching it.

Look 17 miles out and there is one: Tudor Grange, Solihull Dingle Lane - PV Solar Panels in Solihull, 470 kWp, applied for by Tudor Grange Academy, which holds consent and is awaiting construction. None of our doing. It is a public planning record, and the nearest evidence available of how an application like yours is treated around here. Source: Renewable Energy Planning Database, Q1 2026.

Term dates against the Droitwich generation curve

A Droitwich school roof generates most in the weeks its buildings are closed. 25.6 percent of the modelled year lands in July and August alone (EU PVGIS v5.2), and the summer holiday takes roughly six of those nine weeks out of the timetable. July is the single strongest month here at 13.9 percent of the annual total, and it falls almost entirely inside the holiday.

Winter reverses it. December and January between them return 4.9 percent of the modelled year, and that is when the heating, the lighting and a full register are all drawing at the same time. The roof makes 6.1 times as much in July as it does in December, and August alone outproduces December by about 5.1 to one. 74 percent of the year arrives between April and September, and the point of that figure is not that the summer half goes unused, because April, May and June are full teaching months that draw hard. It is that the concentration peaks in the few weeks at the end of it when the building is shut.

Across the country the arithmetic settles at roughly 49 percent of output on a session day, against about 71 percent for a weekday business. That figure hardly varies by location, which is why the local numbers that matter here are the yield, the roofs and what has already cleared planning nearby.

Daily shape compounds it. A school's load climbs from breakfast club, holds through the teaching day and falls away from about three in the afternoon, while generation is still strong until six in high summer. That is why we size against half hourly meter data rather than against annual consumption: the annual figure hides both problems.

That argues for a particular shape of scheme rather than against one. Size to the load that does not stop at the end of term, count in lettings, holiday clubs and summer works honestly rather than optimistically, and then decide whether storage or an export arrangement with National Grid Electricity Distribution pays for the surplus that is left.

We set out the whole argument about term dates and the generation curve on the home page, and what it does to a payback figure under costs.

FIG. 2 A Droitwich roof against the English school year
0 35 70 105 140 Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec kWh August: nobody in the building
  • generated while the school is open
  • generated at a weekend or in the holidays
The same figures as a table
Monthly output for a 1 kWp array in Droitwich, split by whether the day is a school session day. Across the year 49 percent of generation lands while the school is open.
Month Session days Output, kWh per kWp School open School closed
Jan 20 23 15 8
Feb 15 38 20 18
Mar 21 72 49 23
Apr 12 101 40 61
May 17 120 66 54
Jun 21 121 85 36
Jul 11 122 43 79
Aug 0 102 0 102
Sep 20 80 53 27
Oct 17 49 27 22
Nov 21 28 20 8
Dec 15 20 10 10
Year 190 876 428 448
Per kWp installed, month by month, separating generation while the school is open from generation at a weekend or in the holidays. 74 percent of the Droitwich year sits between April and September, most of which is term time; it is the tail of that period, the last week of July and all of August, that the school is not there for. The daily split is a flat apportionment of each month, not a metered one. Session days follow a typical English school year of 190 days. Your own trust or authority may differ by a few days either way. Source: EU PVGIS v5.2, session days from a typical school calendar

Grid connection through National Grid Electricity Distribution

Connections around Droitwich are handled by National Grid Electricity Distribution, which sets the export limit for the site. Above 3.68 kW per phase the connection runs under G99, so the export limit is agreed in advance rather than assumed. Where the local network is constrained, an export-limited connection usually still makes the scheme work, because a school uses most of what the roof makes during the working day.

Across Worcestershire the planning database records 62 solar schemes totalling 506 MW, of which 6 are operational (REPD Q1 2026).

Wychavon schools, phase by phase

Wychavon has 61 open state-funded schools and colleges on the DfE register teaching 14,779 pupils between them. Source: DfE Get Information About Schools.

The split is 53 primary, 7 secondary and 1 special, at an average of 242 pupils a site. Read 7.6 primaries per secondary as a sequencing hint rather than a statistic. A primary is a single survey visit and a modest array; a secondary is several roofs of different ages on one site, and that is where both the area and the complications are.

A trust holding more than one of these sites should look at them together. Grouping the surveys turns the grid question, the funding question and the procurement route into one exercise rather than four, and it usually changes which roof goes first.

Aerial view of a school site with teaching blocks of several different ages, a sports hall and a playing field, solar arrays on two of the flat roofs
A school site with blocks of several ages, which is the usual starting point for a trust estate survey.
Book the survey

Book a roof survey at your Droitwich school

Roof condition decides the order of works on most school estates, so that is where we start. Send us the postcode and a rough roof area, with twelve months of half hourly readings if you have them, and we come back with usable area, modelled output against your own load, and the funding routes.

Lenzie Consulting Ltd arranges the survey and passes your details to an MCS-certified installation partner so they can quote. We do not carry out the installation ourselves.

We pass your details to our MCS-certified installation partner so they can quote. Read the privacy notice.

Droitwich school solar, answered

How much would a school roof near Droitwich generate?
Modelled at 877 kWh per kWp a year, a 470 kWp array on a Droitwich school models at about 412,200 kWh. What decides whether that is worth doing is how much of it the school uses itself, not the total. Source: EU PVGIS v5.2, SARAH3, 10 degree pitch, 14 percent system loss.
How does the school year affect a solar scheme in Droitwich?
It goes somewhere, just not into the timetable. 25.6 percent of the Droitwich generating year lands in July and August (EU PVGIS v5.2), and a closed school still runs servers, comms, refrigeration and ventilation. What that base load does not absorb is either stored, exported under an agreement with National Grid Electricity Distribution, or a sign the array is too big. We test which before sizing anything.
Which network operator handles the connection at a Droitwich school?
Applications go to National Grid Electricity Distribution, who run the network across Worcestershire. An export-limited offer usually still works for a school, because the summer surplus is the part you were least likely to be paid much for anyway.
How many schools are there around Droitwich?
Wychavon has 61 open state-funded schools and colleges on the DfE register, with 14,779 pupils on roll. Source: DfE Get Information About Schools. We survey across the whole of that area, and where a trust holds several sites we look at them in one pass.