Specialist solar panels for schools in Gateshead

What decides a solar scheme at a Gateshead school is how much of the output the site uses itself, not how much the roof makes. We arrange the roof survey, model the output against the school's own half hourly consumption, and set out the funding routes.

26% of the modelled year lands in July and August, on a roof that returns 822 kWh per kWp a year. The worked example below runs at 280 kWp, the median size on the national planning record. Source: EU PVGIS v5.2, SARAH3, 10 degree pitch, 14 percent system loss.

Book a roof survey in Gateshead
playing field 4 1 2 3 no array pending structural assessment 0 40 m N
  1. 1 teaching block
  2. 2 hall and kitchen
  3. 3 sports hall
  4. 4 1960s block, no array
  5. first phase
  6. later phase
Drawing Illustrative Tyne and Wear estate
Blocks 4, 3 with array
Array about 345 kWp
Yield about 284,000 kWh/yr
Frontage about 90 m / Rev A / NE10

Illustrative layout for an estate of this size. The array is drawn at about 345 kWp, roughly 53 percent of the 650 kWp these three roofs would hold, because a school sizes to the load it can use in term time rather than to the roof it has: generation it cannot use is exported at a much lower rate than it pays to import. The hatched block carries no array because its structure has not been assessed, which on a school of that era is the usual starting point rather than an exception. Your own figures, and which of your blocks can take an array, come from the roof survey.

Gateshead / Tyne and Wear
A school on the edge of a North East town, solar arrays on its roofs and low hills beyond
School buildings of the kind we survey across North East. Not a named school and not our work.

Solar for education buildings across Tyne and Wear

A one kilowatt-peak array on a shallow pitched roof in Gateshead models at 822 kWh a year, from modelled irradiation of 1,047 kWh per square metre in the plane of the array (EU PVGIS v5.2, SARAH3, 10 degree pitch, 14 percent system loss). That is about 7 percent below the mean across the towns we cover, so the case at this latitude rests almost entirely on using the output on site rather than exporting it.

Scaled up, a 280 kWp array, sized to the median array applied for at schools on the national planning record, models at about 230,200 kWh a year before shading, and needs roughly 832 square metres of clear roof. We use the national median from the planning record rather than a round number, so the example stays anchored to what schools have applied for.

Spread across the year that is about 59,900 kWh landing in July and August and roughly 9,900 kWh across December and January. Northern Powergrid sets what may go back onto the network here, so the July figure is the one worth putting in front of a governing body first.

FIG. 1 Gateshead against the rest of Tyne and Wear
  • Sunderland849
  • South Shields849
  • North Shields833
  • Washington828
  • Gateshead822
  • Newcastle806

Gateshead ranks 5 of 6 towns we cover in Tyne and Wear on modelled yield, against a national mean of 886 kWh per kWp. The county runs from 806 to 849, a spread of 43 kWh per kWp. On a 500 kWp array that is about 21,500 kWh a year between the strongest and weakest town in the county.

Bars are zero based, so length is proportional to the figure. Where a county is flat, that is the finding: latitude is not the lever, the timetable is. Source: EU PVGIS v5.2, modelled per town

School solar on record near NE10

No school or college solar scheme appears in the NE10 postcode district in the Renewable Energy Planning Database. That is a reporting threshold rather than a verdict. The database records generating stations from one megawatt upward reliably and smaller ones patchily, and almost every school array is a fraction of that, so a roof full of panels on a Gateshead secondary could be generating today without ever reaching it.

Look 11 miles out and there is one: Collingwood College, South Road in Durham, 0 kWp, applied for by Howarth Litchfield Partnership, which holds consent and is awaiting construction. None of our doing. It is a public planning record, and the nearest evidence available of how an application like yours is treated around here. Source: Renewable Energy Planning Database, Q1 2026.

Term dates against the Gateshead generation curve

A Gateshead school roof generates most in the weeks its buildings are closed. 26 percent of the modelled year lands in July and August alone (EU PVGIS v5.2), and the summer holiday takes roughly six of those nine weeks out of the timetable. May is the strongest single month here at 14.5 percent of the annual total, which is still term time, and that works slightly in your favour against towns whose curve peaks in July.

Winter reverses it. December and January between them return 4.3 percent of the modelled year, and that is when the heating, the lighting and a full register are all drawing at the same time. The roof makes 7.4 times as much in May as it does in December, and August alone outproduces December by about 6.1 to one. 75 percent of the year arrives between April and September, and the point of that figure is not that the summer half goes unused, because April, May and June are full teaching months that draw hard. It is that the concentration peaks in the few weeks at the end of it when the building is shut.

Nationally this comes out at about 49 percent of annual generation falling on a session day. A business open every weekday sees roughly 71 percent. The 22 point gap is what a school appraisal has to absorb, and it is much the same in Gateshead as anywhere else.

The same mismatch repeats every day. Peak generation lands between eleven and three, the timetable ends shortly after, and by four the site is down to caretaking and cleaning. An annual consumption figure cannot show that, which is why we ask for the half hourly data instead.

The conclusion is not that a Gateshead school should do nothing. It is that the array should be sized to the load that survives the holidays, which is usually the server room, the catering refrigeration, the ventilation and the hot water, plus whatever the site lets out over the summer. Anything above that line needs storage or an export agreement with Northern Powergrid to earn its keep.

We set out the full treatment of the school year against the generation curve on the home page, and what it does to a payback figure under costs.

FIG. 2 A Gateshead roof against the English school year
0 30 60 90 120 Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec kWh August: nobody in the building
  • generated while the school is open
  • generated at a weekend or in the holidays
The same figures as a table
Monthly output for a 1 kWp array in Gateshead, split by whether the day is a school session day. Across the year 48 percent of generation lands while the school is open.
Month Session days Output, kWh per kWp School open School closed
Jan 20 19 12 7
Feb 15 35 19 16
Mar 21 67 45 22
Apr 12 97 39 58
May 17 119 65 54
Jun 21 112 78 34
Jul 11 116 41 75
Aug 0 98 0 98
Sep 20 75 50 25
Oct 17 44 24 20
Nov 21 25 18 8
Dec 15 16 8 8
Year 190 823 399 424
Each bar is one month's output per kWp, divided at the school gate. The May bar is 7.4 times the December one and the timetable runs the other way round. We apportion a month's generation evenly over its days, having no half hourly data for your meter. Session days follow a typical English school year of 190 days. Your own trust or authority may differ by a few days either way. Source: EU PVGIS v5.2, session days from a typical school calendar

Gateshead schools, phase by phase

Gateshead has 84 open state-funded schools and colleges on the DfE register teaching 28,448 pupils between them. Source: DfE Get Information About Schools.

The split is 68 primary, 9 secondary, 6 special and 1 further education, at an average of 339 pupils a site. Read 7.6 primaries per secondary as a sequencing hint rather than a statistic. A primary is a single survey visit and a modest array; a secondary is several roofs of different ages on one site, and that is where both the area and the complications are.

A trust holding more than one of these sites should look at them together. Grouping the surveys turns the grid question, the funding question and the procurement route into one exercise rather than four, and it usually changes which roof goes first.

Aerial view of a school site with teaching blocks of several different ages, a sports hall and a playing field, solar arrays on two of the flat roofs
A school site with blocks of several ages, which is the usual starting point for a trust estate survey.

Grid connection through Northern Powergrid

Northern Powergrid is the network operator here, and their answer on export capacity shapes the design. Any commercial array above 3.68 kW per phase connects under G99 rather than G98, and the application fixes what you are allowed to push back onto the network. If the local network is tight, limiting export rarely breaks the case here: most of the generation is consumed on site while the building is working.

Across Tyne and Wear the planning database records 116 solar schemes totalling 290 MW, of which 3 are operational (REPD Q1 2026).

Book the survey

Book a roof survey at your Gateshead school

Lenzie Consulting Ltd arranges roof surveys for schools across Tyne and Wear. Send the school postcode and a rough idea of the roof area, and the last twelve months of half hourly meter data if the school holds it. We come back with what the roofs can carry, what they would generate against your own consumption, and the funding routes open to a school.

Lenzie Consulting Ltd arranges the survey and passes your details to an MCS-certified installation partner so they can quote. We do not carry out the installation ourselves.

We pass your details to our MCS-certified installation partner so they can quote. Read the privacy notice.

Gateshead school solar, answered

What would a 280 kWp array produce at a Gateshead school?
Yes, and the figure matters more than the sunshine. 822 kWh per kWp a year puts a 280 kWp array at around 230,200 kWh, on roughly 832 square metres of roof. The value of that depends on your term time load. Source: EU PVGIS v5.2, SARAH3, 10 degree pitch, 14 percent system loss.
What happens to the electricity during the summer holidays in Gateshead?
Less is wasted than governors expect, but the figure is worth seeing: 26 percent of the year is modelled to arrive in July and August here (EU PVGIS v5.2), against a site running on holiday base load. Lettings, holiday clubs and summer works take some of it, storage takes more, and the rest is an export question for Northern Powergrid.
Who do we apply to for export near Gateshead?
Only Northern Powergrid can answer it for your connection. What we can say is that a capped export limit rarely breaks a school scheme, because the array that suits a school is sized to the term time load rather than to the roof.
Do we need planning permission in Gateshead?
Often not, because panels on the roof of a school building usually sit within permitted development for non-domestic buildings. The exceptions are listed buildings, conservation areas and arrays that project too far above the roof plane, and larger schemes still need prior approval from Gateshead. We confirm it either way.
How many schools are there around Gateshead?
Gateshead has 84 open state-funded schools and colleges on the DfE register, with 28,448 pupils on roll. Source: DfE Get Information About Schools. We survey across the whole of that area, and where a trust holds several sites we look at them in one pass.