Solar panels for schools across Somerset
We survey school and college roofs throughout Somerset, model what each one carries against the school's own consumption, and arrange the design, the grid application and the installation through an MCS-certified partner.
- Schools and colleges
- 582
- 171,561 pupils, DfE Get Information About Schools
- Modelled yield
- 914 kWh/kWp/yr
- Mean across Somerset towns, EU PVGIS v5.2
- School solar on record
- 2 schemes
- Renewable Energy Planning Database Q1 2026, in 1 of the towns we cover
- Network operator
- National Grid Electricity Distribution
- G99 applications and export limits
- Towns covered
- 8
- Surveys arranged county wide
The school estate in Somerset
Somerset has 582 open state-funded schools and colleges teaching 171,561 pupils, spread across 4 local authorities. Source: DfE Get Information About Schools.
Of those, 465 primary, 89 secondary, 22 special and 6 further education. The phase mix is what sets the usable roof area across a county: secondary sites and colleges carry the sports halls, dining blocks and flat roofs, while primaries offer a hall and a teaching block each and suit arrays sized to the base load.
Solar for education buildings and what a Somerset roof models
Modelled yield is not flat across Somerset. Weston-super-Mare comes out at 934 kWh per kWp a year against 894 at Frome, a spread of 40 kWh per kWp. On a 310 kWp school array that difference is about 12,400 kWh a year, which is worth checking before anyone accepts a county-wide saving figure. Source: EU PVGIS v5.2.
Every town page below carries the same arithmetic for that town, including the share of the year that lands in July and August, which is the number a governing body should see before a saving figure.
Solar PV for academy trusts on the Somerset planning record
The Renewable Energy Planning Database records 2 school and college solar schemes in Somerset, all of them at Weston-super-Mare. They include Weston College at Weston-super-Mare. The median array applied for is 310 kWp.
We were not involved in any of those schemes. They are public planning records, and they are here because what a local authority and a network operator have already accepted for one school is the best available guide to what they will accept for the next. Source: Renewable Energy Planning Database, Q1 2026.
Connections across the county run through National Grid Electricity Distribution. Anything above 3.68 kW per phase needs a G99 application, and on a school site the incoming supply and the size of the existing main switchboard are often the real constraint rather than the roof.
- Bath 904 kWh/kWp
- Weston-super-Mare 2 on record
- Taunton 911 kWh/kWp
- Yeovil 923 kWh/kWp
- Bridgwater 931 kWh/kWp
- Frome 894 kWh/kWp
- Wells 899 kWh/kWp
- Glastonbury 913 kWh/kWp
Book a roof survey at a Somerset school
Send the school postcode and the rough roof area, with half hourly meter data if the trust holds it. We come back with what the roofs carry, what they generate against the timetable rather than against an annual average, and how schools pay for it.
Lenzie Consulting Ltd arranges the survey and introduces an MCS-certified installation partner. We do not install, and nothing on this page is a guarantee of a saving.