Solar panels for schools across Shropshire
We survey school and college roofs throughout Shropshire, model what each one carries against the school's own consumption, and arrange the design, the grid application and the installation through an MCS-certified partner.
- Schools and colleges
- 151
- 39,029 pupils, DfE Get Information About Schools
- Modelled yield
- 853 kWh/kWp/yr
- Mean across Shropshire towns, EU PVGIS v5.2
- School solar on record
- 0 schemes
- Renewable Energy Planning Database Q1 2026, in 0 of the towns we cover
- Network operator
- National Grid Electricity Distribution
- G99 applications and export limits
- Towns covered
- 5
- Surveys arranged county wide
The school estate in Shropshire
Shropshire has 151 open state-funded schools and colleges teaching 39,029 pupils, spread across 1 local authorities. Source: DfE Get Information About Schools.
Of those, 127 primary, 20 secondary, 3 special and 1 further education. The phase mix is what sets the usable roof area across a county: secondary sites and colleges carry the sports halls, dining blocks and flat roofs, while primaries offer a hall and a teaching block each and suit arrays sized to the base load.
School rooftop solar and what a Shropshire roof models
Modelled yield is consistent across Shropshire, from 842 kWh per kWp a year at Market Drayton to 860 at Ludlow. At that spread, where the school stands is not what decides the scheme. The timetable is. Source: EU PVGIS v5.2.
Every town page below carries the same arithmetic for that town, including the share of the year that lands in July and August, which is the number a governing body should see before a saving figure.
Solar PV for academy trusts on the Shropshire planning record
No school or college solar scheme appears for the Shropshire towns we cover in the Renewable Energy Planning Database. That reflects the reporting threshold rather than an empty county: the database captures generating stations from one megawatt upward reliably, and a school array is a fraction of that. Source: Renewable Energy Planning Database, Q1 2026.
Connections across the county run through National Grid Electricity Distribution. Anything above 3.68 kW per phase needs a G99 application, and on a school site the incoming supply and the size of the existing main switchboard are often the real constraint rather than the roof.
- Shrewsbury 852 kWh/kWp
- Oswestry 855 kWh/kWp
- Bridgnorth 856 kWh/kWp
- Market Drayton 842 kWh/kWp
- Ludlow 860 kWh/kWp
Book a roof survey at a Shropshire school
Send the school postcode and the rough roof area, with half hourly meter data if the trust holds it. We come back with what the roofs carry, what they generate against the timetable rather than against an annual average, and how schools pay for it.
Lenzie Consulting Ltd arranges the survey and introduces an MCS-certified installation partner. We do not install, and nothing on this page is a guarantee of a saving.