National Grid Electricity Distribution runs the network around Brecon, and on a school site their answer on export shapes the design as much as the roof pitch does. We look at the roof, the switchboard and the timetable in that order, then set the array size against what the site draws in term time.

25.5% of the modelled year lands in July and August, on a roof that returns 828 kWh per kWp a year. The worked example below runs at 320 kWp, the size applied for at the nearest school scheme on record. Source: EU PVGIS v5.2, SARAH3, 10 degree pitch, 14 percent system loss.

Book a roof survey in Brecon
playing field 4 1 2 3 no array pending structural assessment 0 40 m N
  1. 1 teaching block
  2. 2 hall and kitchen
  3. 3 sports hall
  4. 4 1960s block, no array
  5. first phase
  6. later phase
Drawing Illustrative Powys estate
Blocks 4, 3 with array
Array about 345 kWp
Yield about 286,000 kWh/yr
Frontage about 90 m / Rev A / Powys

Illustrative layout for an estate of this size. The array is drawn at about 345 kWp, roughly 53 percent of the 650 kWp these three roofs would hold, because a school sizes to the load it can use in term time rather than to the roof it has: generation it cannot use is exported at a much lower rate than it pays to import. The hatched block carries no array because its structure has not been assessed, which on a school of that era is the usual starting point rather than an exception. Your own figures, and which of your blocks can take an array, come from the roof survey.

Brecon / Powys
A two storey 1970s school block with a shallow pitched roof covered in solar panels, empty playground in front and a playing field beyond
School buildings of the kind we survey across Powys. Not a named school and not our work.

School rooftop solar across Powys

A one kilowatt-peak array on a shallow pitched roof in Brecon models at 828 kWh a year, from modelled irradiation of 1,057 kWh per square metre in the plane of the array (EU PVGIS v5.2, SARAH3, 10 degree pitch, 14 percent system loss). 7 percent below our mean puts Brecon at the weaker end of the range, which raises the premium on self consumption and lowers the value of anything that leaves the site.

Scaled up, a 320 kWp array, sized to what the nearest school scheme on record applied for, 46 miles away at Weston-super-Mare, models at about 265,000 kWh a year before shading, and needs roughly 950 square metres of clear roof. We take the size from the nearest real application rather than a round number, so the example is anchored to something a planning officer has already seen.

Spread across the year that is about 67,600 kWh landing in July and August and roughly 11,900 kWh across December and January. National Grid Electricity Distribution sets what may go back onto the network here, so the July figure is the one worth putting in front of a governing body first.

FIG. 1 Brecon against the rest of Powys
  • Hay on Wye838
  • Welshpool831
  • Builth Wells830
  • Brecon828
  • Llandrindod Wells825
  • Newtown820

Brecon ranks 4 of 6 towns we cover in Powys on modelled yield, against a national mean of 886 kWh per kWp. The county runs from 820 to 838, a spread of 18 kWh per kWp. Within Powys that difference is small enough to ignore: where the building sits is not what decides this scheme, your consumption pattern is.

Bars are zero based, so length is proportional to the figure. Where a county is flat, that is the finding: latitude is not the lever, the timetable is. Source: EU PVGIS v5.2, modelled per town

What the planning record shows around Brecon

The Renewable Energy Planning Database holds no school scheme for Brecon and the area around it. Read that as a gap in the record, not a gap in the roofs: the database is reliable above one megawatt and thin below it, and a school array is typically a fifth of a megawatt.

The nearest education scheme on the record is 46 miles from Brecon, at Weston-super-Mare: 300 kWp at Weston College, applicant Weston College, which holds consent and is awaiting construction. That is someone else's application, not ours, and it is here because it shows what Somerset planning has already accepted at an education site. Source: Renewable Energy Planning Database, Q1 2026.

The summer holiday problem for a Brecon school

25.5 percent of the annual output modelled for Brecon arrives in the two months a school uses least (EU PVGIS v5.2). Term ends in the third week of July and the buildings stay largely empty until September. June is the strongest single month here at 14 percent of the annual total, which is still term time, and that works slightly in your favour against towns whose curve peaks in July.

The inverse holds at the other end. December and January together return only 4.5 percent of the year, and those are the months with the heating, the lighting and the full timetable all running at once. The roof makes 6.8 times as much in June as it does in December, and August alone outproduces December by about 5.7 to one. 75 percent of the year arrives between April and September, and the point of that figure is not that the summer half goes unused, because April, May and June are full teaching months that draw hard. It is that the concentration peaks in the few weeks at the end of it when the building is shut.

Put the two calendars together and roughly 49 percent of a school's generation nationally lands on a session day, against about 71 percent for a business open every weekday. That gap is the whole difference between appraising a school roof and appraising any other commercial one, and it barely moves from town to town.

The daily curve does the same thing in miniature. Load drops sharply after about three o'clock, generation does not, so the last three hours of a summer afternoon are pushing into an empty building unless something absorbs them. Half hourly meter data is the only way to see how much.

None of that makes a Brecon scheme a bad one. It changes what the scheme should be: sized against the base load that runs whether or not the school is open, which on most sites is servers, comms, catering refrigeration, ventilation and hot water, with lettings, holiday clubs and summer works added on top. Where that base load is thin, the choices are storage, an export arrangement through National Grid Electricity Distribution, or a smaller array that consumes nearly everything it makes.

We set out the full treatment of the school year against the generation curve on the home page, and what it does to a payback figure under costs.

FIG. 2 A Brecon roof against the Welsh school year
0 30 60 90 120 Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec kWh August: nobody in the building
  • generated while the school is open
  • generated at a weekend or in the holidays
The same figures as a table
Monthly output for a 1 kWp array in Brecon, split by whether the day is a school session day. Across the year 49 percent of generation lands while the school is open.
Month Session days Output, kWh per kWp School open School closed
Jan 20 20 13 7
Feb 15 34 18 16
Mar 21 69 47 22
Apr 12 100 40 60
May 17 115 63 52
Jun 21 116 81 35
Jul 11 114 40 74
Aug 0 97 0 97
Sep 20 76 51 25
Oct 17 44 24 20
Nov 21 26 18 8
Dec 15 17 8 9
Year 190 828 403 425
Each bar is one month's output per kWp, divided at the school gate. The June bar is 6.8 times the December one and the timetable runs the other way round. We apportion a month's generation evenly over its days, having no half hourly data for your meter. Session days follow a typical school year in England and Wales, 190 days on broadly the same dates. Your own authority or trust may differ by a few days. Source: EU PVGIS v5.2, session days from a typical school calendar

Grid connection through National Grid Electricity Distribution

National Grid Electricity Distribution is the network operator here, and their answer on export capacity shapes the design. Any commercial array above 3.68 kW per phase connects under G99 rather than G98, and the application fixes what you are allowed to push back onto the network. If the local network is tight, limiting export rarely breaks the case here: most of the generation is consumed on site while the building is working.

Across Powys the planning database records 18 solar schemes totalling 39 MW, of which 1 are operational (REPD Q1 2026).

Book the survey

Start with the Brecon roof

Lenzie Consulting Ltd arranges roof surveys for schools across Powys. Send the school postcode and a rough idea of the roof area, and the last twelve months of half hourly meter data if the school holds it. We come back with what the roofs can carry, what they would generate against your own consumption, and the funding routes open to a school.

Lenzie Consulting Ltd arranges the survey and passes your details to an MCS-certified installation partner so they can quote. We do not carry out the installation ourselves.

We pass your details to our MCS-certified installation partner so they can quote. Read the privacy notice.

Questions governors ask us about Brecon schools

What would a 320 kWp array produce at a Brecon school?
Yes, and the figure matters more than the sunshine. 828 kWh per kWp a year puts a 320 kWp array at around 265,000 kWh, on roughly 950 square metres of roof. The value of that depends on your term time load. Source: EU PVGIS v5.2, SARAH3, 10 degree pitch, 14 percent system loss.
What happens to the electricity during the summer holidays in Brecon?
Less is wasted than governors expect, but the figure is worth seeing: 25.5 percent of the year is modelled to arrive in July and August here (EU PVGIS v5.2), against a site running on holiday base load. Lettings, holiday clubs and summer works take some of it, storage takes more, and the rest is an export question for National Grid Electricity Distribution.
Who do we apply to for export near Brecon?
Only National Grid Electricity Distribution can answer it for your connection. What we can say is that a capped export limit rarely breaks a school scheme, because the array that suits a school is sized to the term time load rather than to the roof.