A 410 kWp array at St Christophers School, Queens Road is the nearest school scheme on the planning record, and it holds consent and is awaiting construction. What we come back with is the usable roof area, the modelled output against your meter data, and the routes schools use to pay for it.

783 kWh per kWp a year at this latitude, so a 410 kWp array, the median size schools around Accrington have applied for, models at about 321,000 kWh. Source: EU PVGIS v5.2, SARAH3, 10 degree pitch, 14 percent system loss.

Book a roof survey in Accrington
playing field 4 1 2 3 no array pending structural assessment 0 40 m N
  1. 1 teaching block
  2. 2 hall and kitchen
  3. 3 sports hall
  4. 4 1960s block, no array
  5. first phase
  6. later phase
Drawing Typical school site, Accrington scale
Blocks 4, 3 with array
Array about 345 kWp
Yield about 270,000 kWh/yr
Frontage about 90 m / Rev A / BB5

Illustrative layout for an estate of this size. The array is drawn at about 345 kWp, roughly 53 percent of the 650 kWp these three roofs would hold, because a school sizes to the load it can use in term time rather than to the roof it has: generation it cannot use is exported at a much lower rate than it pays to import. The hatched block carries no array because its structure has not been assessed, which on a school of that era is the usual starting point rather than an exception. Your own figures, and which of your blocks can take an array, come from the roof survey.

Accrington / Lancashire
A school on the edge of a Greater Manchester town, solar arrays on its roofs and low Pennine hills beyond
School buildings of the kind we survey across North West. Not a named school and not our work.

Schools near Accrington already on the planning record

The Renewable Energy Planning Database records 1 school and college solar scheme in the BB5 postcode district. A 410 kWp roof mounted array at St Christophers School, Queens Road holds consent and is awaiting construction. The applicant on record is Solar Options for Schools Limited.

We had nothing to do with any of them. They are public planning records, and they are on this page because the useful question for a governing body is not whether school solar works in the abstract but whether it has been consented nearby. Source: Renewable Energy Planning Database, Q1 2026.

The site plan at the top of this page is a generic estate drawn to show scale and sequencing. It is not St Christophers School, Queens Road, and it is not any other building in Accrington. We hold no drawings, roof data or consumption data for the schools named above.

The median array applied for here is 410 kWp. At 410 kWp you are covering roughly 1,218 square metres of roof once walkways, edge zones and rooflight setbacks come out, which on most sites means a sports hall plus one teaching block rather than the whole estate.

Site on record Applicant on record Size Mounting Status
St Christophers School, Queens Road Solar Options for Schools Limited 410 kWp Roof Awaiting Construction

School rooftop solar across Lancashire

A one kilowatt-peak array on a shallow pitched roof in Accrington models at 783 kWh a year, from modelled irradiation of 997 kWh per square metre in the plane of the array (EU PVGIS v5.2, SARAH3, 10 degree pitch, 14 percent system loss). That is about 12 percent below the mean across the towns we cover, so the case at this latitude rests almost entirely on using the output on site rather than exporting it.

Scaled up, a 410 kWp array, sized to the median array applied for at schools around Accrington itself, models at about 321,000 kWh a year before shading, and needs roughly 1,218 square metres of clear roof. That size is not one we chose. It is what schools in this district have actually applied for.

Spread across the year that is about 83,800 kWh landing in July and August and roughly 11,900 kWh across December and January. Electricity North West sets what may go back onto the network here, so the July figure is the one worth putting in front of a governing body first.

FIG. 1 Accrington against the rest of Lancashire
  • Blackpool888
  • Lytham St Anne's878
  • Preston805
  • Lancaster797
  • Chorley787
  • Accrington783
  • Blackburn782
  • Burnley774

Accrington ranks 6 of 8 towns we cover in Lancashire on modelled yield, against a national mean of 886 kWh per kWp. The county runs from 774 to 888, a spread of 114 kWh per kWp. On a 500 kWp array that is about 57,000 kWh a year between the strongest and weakest town in the county.

Bars are zero based, so length is proportional to the figure. Where a county is flat, that is the finding: latitude is not the lever, the timetable is. Source: EU PVGIS v5.2, modelled per town

The summer holiday problem for a Accrington school

26.1 percent of the annual output modelled for Accrington arrives in the two months a school uses least (EU PVGIS v5.2). Term ends in the third week of July and the buildings stay largely empty until September. May is the strongest single month here at 14.6 percent of the annual total, which is still term time, and that works slightly in your favour against towns whose curve peaks in July.

The inverse holds at the other end. December and January together return only 3.7 percent of the year, and those are the months with the heating, the lighting and the full timetable all running at once. The roof makes 8.8 times as much in May as it does in December, and August alone outproduces December by about 7.2 to one. 76 percent of the year arrives between April and September, and the point of that figure is not that the summer half goes unused, because April, May and June are full teaching months that draw hard. It is that the concentration peaks in the few weeks at the end of it when the building is shut.

Nationally this comes out at about 49 percent of annual generation falling on a session day. A business open every weekday sees roughly 71 percent. The 22 point gap is what a school appraisal has to absorb, and it is much the same in Accrington as anywhere else.

And the week has the same hole in it. Two days in seven the site is closed altogether, at no cost to the generation, which is part of why the session day share sits where it does. Weekend lettings are the one lever a Accrington school has over that, and they are worth counting properly.

The conclusion is not that a Accrington school should do nothing. It is that the array should be sized to the load that survives the holidays, which is usually the server room, the catering refrigeration, the ventilation and the hot water, plus whatever the site lets out over the summer. Anything above that line needs storage or an export agreement with Electricity North West to earn its keep.

We set out the complete version of the term time arithmetic on the home page, and what it does to a payback figure under costs.

FIG. 2 A Accrington roof against the English school year
0 30 60 90 120 Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec kWh August: nobody in the building
  • generated while the school is open
  • generated at a weekend or in the holidays
The same figures as a table
Monthly output for a 1 kWp array in Accrington, split by whether the day is a school session day. Across the year 48 percent of generation lands while the school is open.
Month Session days Output, kWh per kWp School open School closed
Jan 20 16 10 6
Feb 15 32 17 15
Mar 21 64 43 21
Apr 12 96 38 58
May 17 114 63 51
Jun 21 110 77 33
Jul 11 111 39 72
Aug 0 93 0 93
Sep 20 69 46 23
Oct 17 41 22 19
Nov 21 23 16 7
Dec 15 13 6 7
Year 190 782 377 405
Output per kWp installed, split by whether the day is a session day. July and August are 26.1 percent of the Accrington year and the school is shut for most of them. Each month's total is spread evenly across its days, which is the only split available without half hourly readings. Session days follow a typical English school year of 190 days. Your own trust or authority may differ by a few days either way. Source: EU PVGIS v5.2, session days from a typical school calendar

How many schools Hyndburn has

Hyndburn has 43 open state-funded schools and colleges on the DfE register teaching 12,269 pupils between them. Source: DfE Get Information About Schools.

The split is 36 primary, 6 secondary and 1 special, at an average of 285 pupils a site. A ratio of 6 to one tells you where the roof area is. It is not with the 36 primaries, which mostly offer a hall and a teaching block each, but with the larger sites that were built with a sports hall and a dining block attached.

Where a multi-academy trust holds several of those sites, surveying the estate in one pass beats taking a roof at a time. The design work, the connection applications and the procurement paperwork are the same job repeated, and a trust that runs them together gets a better answer on all three.

Aerial view of a school site with teaching blocks of several different ages, a sports hall and a playing field, solar arrays on two of the flat roofs
A school site with blocks of several ages, which is the usual starting point for a trust estate survey.

Grid connection through Electricity North West

Electricity North West is the network operator here, and their answer on export capacity shapes the design. Any commercial array above 3.68 kW per phase connects under G99 rather than G98, and the application fixes what you are allowed to push back onto the network. If the local network is tight, limiting export rarely breaks the case here: most of the generation is consumed on site while the building is working.

Across Lancashire the planning database records 161 solar schemes totalling 521 MW, of which 25 are operational (REPD Q1 2026).

Book the survey

Start with the Accrington roof

Roof condition decides the order of works on most school estates, so that is where we start. Send us the postcode and a rough roof area, with twelve months of half hourly readings if you have them, and we come back with usable area, modelled output against your own load, and the funding routes.

Lenzie Consulting Ltd arranges the survey and passes your details to an MCS-certified installation partner so they can quote. We do not carry out the installation ourselves.

We pass your details to our MCS-certified installation partner so they can quote. Read the privacy notice.

Questions governors ask us about Accrington schools

What would a 410 kWp array produce at a Accrington school?
Yes, and the figure matters more than the sunshine. 783 kWh per kWp a year puts a 410 kWp array at around 321,000 kWh, on roughly 1,218 square metres of roof. The value of that depends on your term time load. Source: EU PVGIS v5.2, SARAH3, 10 degree pitch, 14 percent system loss.
What happens to the electricity during the summer holidays in Accrington?
Less is wasted than governors expect, but the figure is worth seeing: 26.1 percent of the year is modelled to arrive in July and August here (EU PVGIS v5.2), against a site running on holiday base load. Lettings, holiday clubs and summer works take some of it, storage takes more, and the rest is an export question for Electricity North West.
Who do we apply to for export near Accrington?
Only Electricity North West can answer it for your connection. What we can say is that a capped export limit rarely breaks a school scheme, because the array that suits a school is sized to the term time load rather than to the roof.
Do we need planning permission in Hyndburn?
Often not, because panels on the roof of a school building usually sit within permitted development for non-domestic buildings. The exceptions are listed buildings, conservation areas and arrays that project too far above the roof plane, and larger schemes still need prior approval from Hyndburn. We confirm it either way.
Has a school near BB5 already done this?
One school scheme is on record in this postcode district, including a 410 kWp array at St Christophers School, Queens Road that holds consent and is awaiting construction. We were not involved in it. It is a public planning record, and it matters less as proof that solar works than as evidence of what this authority and this network operator have already accepted. Source: Renewable Energy Planning Database, Q1 2026.
How many schools are there around Accrington?
Hyndburn has 43 open state-funded schools and colleges on the DfE register, with 12,269 pupils on roll. Source: DfE Get Information About Schools. We survey across the whole of that area, and where a trust holds several sites we look at them in one pass.