schoolsolarpanels Solar for schools and academy trusts Book a roof survey

Specialist solar panels for schools in Altrincham

Trafford has 90 state-funded schools and colleges, and most of them are buying electricity in exactly the hours their own roofs could be making it. We start with the roof build up and the age of the covering, because across a school estate that is usually what decides which block goes first.

816 kWh per kWp a year at this latitude, so a 220 kWp array, the size applied for at the nearest school scheme on record, models at about 179,500 kWh. Source: EU PVGIS v5.2, SARAH3, 10 degree pitch, 14 percent system loss.

Book a roof survey in Altrincham
playing field 4 1 2 3 no array pending structural assessment 0 40 m N
  1. 1 teaching block
  2. 2 hall and kitchen
  3. 3 sports hall
  4. 4 1960s block, no array
  5. first phase
  6. later phase
Drawing Typical school site, Altrincham scale
Blocks 4, 3 with array
Array about 345 kWp
Yield about 282,000 kWh/yr
Frontage about 90 m / Rev A / WA14

Illustrative layout for an estate of this size. The array is drawn at about 345 kWp, roughly 53 percent of the 650 kWp these three roofs would hold, because a school sizes to the load it can use in term time rather than to the roof it has: generation it cannot use is exported at a much lower rate than it pays to import. The hatched block carries no array because its structure has not been assessed, which on a school of that era is the usual starting point rather than an exception. Your own figures, and which of your blocks can take an array, come from the roof survey.

Altrincham / Greater Manchester
A school on the edge of a Greater Manchester town, solar arrays on its roofs and low Pennine hills beyond
School buildings of the kind we survey across North West. Not a named school and not our work.

Solar for education buildings across Greater Manchester

A one kilowatt-peak array on a shallow pitched roof in Altrincham models at 816 kWh a year, from modelled irradiation of 1,046 kWh per square metre in the plane of the array (EU PVGIS v5.2, SARAH3, 10 degree pitch, 14 percent system loss). 8 percent below our mean puts Altrincham at the weaker end of the range, which raises the premium on self consumption and lowers the value of anything that leaves the site.

Scaled up, a 220 kWp array, sized to what the nearest school scheme on record applied for, 7 miles away at Salford, models at about 179,500 kWh a year before shading, and needs roughly 653 square metres of clear roof. We take the size from the nearest real application rather than a round number, so the example is anchored to something a planning officer has already seen.

Spread across the year that is about 46,100 kWh landing in July and August and roughly 7,700 kWh across December and January. Electricity North West sets what may go back onto the network here, so the July figure is the one worth putting in front of a governing body first.

FIG. 1 Altrincham against the rest of Greater Manchester
  • Wigan828
  • Altrincham816
  • Bolton801
  • Salford794
  • Manchester788
  • Bury788
  • Stockport785
  • Rochdale771
  • Oldham771

Altrincham ranks 2 of 10 towns we cover in Greater Manchester on modelled yield, against a national mean of 886 kWh per kWp. The county runs from 769 to 828, a spread of 59 kWh per kWp. On a 500 kWp array that is about 29,500 kWh a year between the strongest and weakest town in the county.

Bars are zero based, so length is proportional to the figure. Where a county is flat, that is the finding: latitude is not the lever, the timetable is. Source: EU PVGIS v5.2, modelled per town

School solar on record near WA14

No school or college solar scheme appears in the WA14 postcode district in the Renewable Energy Planning Database. That is a reporting threshold rather than a verdict. The database records generating stations from one megawatt upward reliably and smaller ones patchily, and almost every school array is a fraction of that, so a roof full of panels on a Altrincham secondary could be generating today without ever reaching it.

Look 7 miles out and there is one: The Albion Academy, London Street in Salford, 220 kWp, applied for by Barker Associates Llp, which holds consent and is awaiting construction. None of our doing. It is a public planning record, and the nearest evidence available of how an application like yours is treated around here. Source: Renewable Energy Planning Database, Q1 2026.

Term dates against the Altrincham generation curve

A Altrincham school roof generates most in the weeks its buildings are closed. 25.7 percent of the modelled year lands in July and August alone (EU PVGIS v5.2), and the summer holiday takes roughly six of those nine weeks out of the timetable. May is the strongest single month here at 14.2 percent of the annual total, which is still term time, and that works slightly in your favour against towns whose curve peaks in July.

Winter reverses it. December and January between them return 4.3 percent of the modelled year, and that is when the heating, the lighting and a full register are all drawing at the same time. The roof makes 6.8 times as much in May as it does in December, and August alone outproduces December by about 5.7 to one. 75 percent of the year arrives between April and September, and the point of that figure is not that the summer half goes unused, because April, May and June are full teaching months that draw hard. It is that the concentration peaks in the few weeks at the end of it when the building is shut.

Put the two calendars together and roughly 49 percent of a school's generation nationally lands on a session day, against about 71 percent for a business open every weekday. That gap is the whole difference between appraising a school roof and appraising any other commercial one, and it barely moves from town to town.

Daily shape compounds it. A school's load climbs from breakfast club, holds through the teaching day and falls away from about three in the afternoon, while generation is still strong until six in high summer. That is why we size against half hourly meter data rather than against annual consumption: the annual figure hides both problems.

None of that makes a Altrincham scheme a bad one. It changes what the scheme should be: sized against the base load that runs whether or not the school is open, which on most sites is servers, comms, catering refrigeration, ventilation and hot water, with lettings, holiday clubs and summer works added on top. Where that base load is thin, the choices are storage, an export arrangement through Electricity North West, or a smaller array that consumes nearly everything it makes.

We set out the complete version of the term time arithmetic on the home page, and what it does to a payback figure under costs.

FIG. 2 A Altrincham roof against the English school year
0 30 60 90 120 Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec kWh August: nobody in the building
  • generated while the school is open
  • generated at a weekend or in the holidays
The same figures as a table
Monthly output for a 1 kWp array in Altrincham, split by whether the day is a school session day. Across the year 49 percent of generation lands while the school is open.
Month Session days Output, kWh per kWp School open School closed
Jan 20 18 12 6
Feb 15 35 19 16
Mar 21 68 46 22
Apr 12 97 39 58
May 17 116 64 52
Jun 21 114 80 34
Jul 11 113 40 73
Aug 0 97 0 97
Sep 20 73 49 24
Oct 17 44 24 20
Nov 21 25 18 8
Dec 15 17 8 9
Year 190 817 399 418
Output per kWp installed, split by whether the day is a session day. July and August are 25.7 percent of the Altrincham year and the school is shut for most of them. Each month's total is spread evenly across its days, which is the only split available without half hourly readings. Session days follow a typical English school year of 190 days. Your own trust or authority may differ by a few days either way. Source: EU PVGIS v5.2, session days from a typical school calendar

Grid connection through Electricity North West

Electricity North West operates the distribution network across Greater Manchester, so the export application goes to them. Anything larger than 3.68 kW per phase falls under G99, which means an application before commissioning rather than a notification afterwards. A constrained network is not the end of a scheme. Capping export costs little when the building already absorbs most of what the roof produces.

Across Greater Manchester the planning database records 118 solar schemes totalling 110 MW, of which 11 are operational (REPD Q1 2026).

Trafford schools, phase by phase

Trafford has 90 open state-funded schools and colleges on the DfE register teaching 42,912 pupils between them. Source: DfE Get Information About Schools.

The split is 63 primary, 19 secondary, 7 special and 1 further education, at an average of 477 pupils a site. Read 3.3 primaries per secondary as a sequencing hint rather than a statistic. A primary is a single survey visit and a modest array; a secondary is several roofs of different ages on one site, and that is where both the area and the complications are.

A trust holding more than one of these sites should look at them together. Grouping the surveys turns the grid question, the funding question and the procurement route into one exercise rather than four, and it usually changes which roof goes first.

Aerial view of a school site with teaching blocks of several different ages, a sports hall and a playing field, solar arrays on two of the flat roofs
A school site with blocks of several ages, which is the usual starting point for a trust estate survey.
Book the survey

Book a roof survey at your Altrincham school

We survey school and college roofs throughout Greater Manchester. We need the postcode, a rough roof area and your half hourly meter data if the trust has it. From that we model what the roof carries, what it generates against the timetable, and which of the funding routes actually suits a school of your size.

Lenzie Consulting Ltd arranges the survey and passes your details to an MCS-certified installation partner so they can quote. We do not carry out the installation ourselves.

We pass your details to our MCS-certified installation partner so they can quote. Read the privacy notice.

Altrincham school solar, answered

Is there enough sun around Altrincham for this to be worth doing?
The model gives 816 kWh a year for every kWp installed at this latitude, so a 220 kWp array comes out at roughly 179,500 kWh a year before shading. It needs about 653 square metres of clear roof once walkways and rooflight setbacks are allowed for. Source: EU PVGIS v5.2, SARAH3, 10 degree pitch, 14 percent system loss.
Does a Altrincham school waste its generation in August?
25.7 percent of the modelled annual output for Altrincham falls in July and August, when the buildings are closed for most of six weeks (EU PVGIS v5.2). It does not go to waste, but it only has three places to go: the base load that runs regardless, such as servers, catering refrigeration and ventilation; storage; or export under an agreement with Electricity North West. We model all three against your half hourly data before an array is sized.
Will the network around Altrincham accept the export?
Electricity North West is the distribution network operator for Greater Manchester. Anything above 3.68 kW per phase connects under G99, and the application fixes the export limit. On a school site the incoming supply is often the binding constraint rather than the roof, so we ask that question before anyone sizes an array.
Is planning permission needed for panels on a school in Altrincham?
Usually permitted development covers a roof array on a school, with prior approval from Manchester needed above a capacity threshold. A ground mounted array in the grounds is a different question and much more likely to need a full application. We check both before design sign-off.
How many schools are there around Altrincham?
Trafford has 90 open state-funded schools and colleges on the DfE register, with 42,912 pupils on roll. Source: DfE Get Information About Schools. We survey across the whole of that area, and where a trust holds several sites we look at them in one pass.

Nearby

All Greater Manchester locations