What decides a solar scheme at a Goole school is how much of the output the site uses itself, not how much the roof makes. We arrange the roof survey, model the output against the school's own half hourly consumption, and set out the funding routes.

26.1% of the modelled year lands in July and August, on a roof that returns 858 kWh per kWp a year. The worked example below runs at 440 kWp, the size applied for at the nearest school scheme on record. Source: EU PVGIS v5.2, SARAH3, 10 degree pitch, 14 percent system loss.

Book a roof survey in Goole
playing field 4 1 2 3 no array pending structural assessment 0 40 m N
  1. 1 teaching block
  2. 2 hall and kitchen
  3. 3 sports hall
  4. 4 1960s block, no array
  5. first phase
  6. later phase
Drawing Illustrative East Riding of Yorkshire estate
Blocks 4, 3 with array
Array about 345 kWp
Yield about 296,000 kWh/yr
Frontage about 90 m / Rev A / DN14

Illustrative layout for an estate of this size. The array is drawn at about 345 kWp, roughly 53 percent of the 650 kWp these three roofs would hold, because a school sizes to the load it can use in term time rather than to the roof it has: generation it cannot use is exported at a much lower rate than it pays to import. The hatched block carries no array because its structure has not been assessed, which on a school of that era is the usual starting point rather than an exception. Your own figures, and which of your blocks can take an array, come from the roof survey.

Goole / East Riding of Yorkshire
A school on the edge of a West Yorkshire town, solar arrays on its roofs and walled fields rising to moorland beyond
School buildings of the kind we survey across Yorkshire and The Humber. Not a named school and not our work.

Solar for education buildings across East Riding of Yorkshire

A one kilowatt-peak array on a shallow pitched roof in Goole models at 858 kWh a year, from modelled irradiation of 1,098 kWh per square metre in the plane of the array (EU PVGIS v5.2, SARAH3, 10 degree pitch, 14 percent system loss). That is about 3 percent below the mean across the towns we cover, which is a smaller gap than most schools expect and smaller than the gap between a well matched and a badly matched system.

Scaled up, a 440 kWp array, sized to what the nearest school scheme on record applied for, 40 miles away at Ripon, models at about 377,500 kWh a year before shading, and needs roughly 1,307 square metres of clear roof. We take the size from the nearest real application rather than a round number, so the example is anchored to something a planning officer has already seen.

Spread across the year that is about 98,500 kWh landing in July and August and roughly 17,000 kWh across December and January. Northern Powergrid sets what may go back onto the network here, so the July figure is the one worth putting in front of a governing body first.

FIG. 1 Goole against the rest of East Riding of Yorkshire
  • Driffield870
  • Hessle868
  • Hull867
  • Beverley864
  • Bridlington859
  • Goole858

Goole ranks 6 of 6 towns we cover in East Riding of Yorkshire on modelled yield, against a national mean of 886 kWh per kWp. The county runs from 858 to 870, a spread of 12 kWh per kWp. Within East Riding of Yorkshire that difference is small enough to ignore: where the building sits is not what decides this scheme, your consumption pattern is.

Bars are zero based, so length is proportional to the figure. Where a county is flat, that is the finding: latitude is not the lever, the timetable is. Source: EU PVGIS v5.2, modelled per town

School solar on record near DN14

The DN14 postcode district has no education solar entry in the Renewable Energy Planning Database. Almost no school array is large enough to be captured there reliably, so the absence tells you about the reporting threshold and very little about what is already on the roofs around Goole.

Look 40 miles out and there is one: Ripon Grammar School, Clotherholme Road in Ripon, 440 kWp, applied for by Solar Options for Schools Limited, which holds consent and is awaiting construction. None of our doing. It is a public planning record, and the nearest evidence available of how an application like yours is treated around here. Source: Renewable Energy Planning Database, Q1 2026.

Term dates against the Goole generation curve

A Goole school roof generates most in the weeks its buildings are closed. 26.1 percent of the modelled year lands in July and August alone (EU PVGIS v5.2), and the summer holiday takes roughly six of those nine weeks out of the timetable. May is the strongest single month here at 14.2 percent of the annual total, which is still term time, and that works slightly in your favour against towns whose curve peaks in July.

Winter reverses it. December and January between them return 4.5 percent of the modelled year, and that is when the heating, the lighting and a full register are all drawing at the same time. The roof makes 6.8 times as much in May as it does in December, and August alone outproduces December by about 5.8 to one. 75 percent of the year arrives between April and September, and the point of that figure is not that the summer half goes unused, because April, May and June are full teaching months that draw hard. It is that the concentration peaks in the few weeks at the end of it when the building is shut.

Nationally this comes out at about 49 percent of annual generation falling on a session day. A business open every weekday sees roughly 71 percent. The 22 point gap is what a school appraisal has to absorb, and it is much the same in Goole as anywhere else.

Daily shape compounds it. A school's load climbs from breakfast club, holds through the teaching day and falls away from about three in the afternoon, while generation is still strong until six in high summer. That is why we size against half hourly meter data rather than against annual consumption: the annual figure hides both problems.

The conclusion is not that a Goole school should do nothing. It is that the array should be sized to the load that survives the holidays, which is usually the server room, the catering refrigeration, the ventilation and the hot water, plus whatever the site lets out over the summer. Anything above that line needs storage or an export agreement with Northern Powergrid to earn its keep.

We set out the full treatment of the school year against the generation curve on the home page, and what it does to a payback figure under costs.

FIG. 2 A Goole roof against the English school year
0 35 70 105 140 Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec kWh August: nobody in the building
  • generated while the school is open
  • generated at a weekend or in the holidays
The same figures as a table
Monthly output for a 1 kWp array in Goole, split by whether the day is a school session day. Across the year 48 percent of generation lands while the school is open.
Month Session days Output, kWh per kWp School open School closed
Jan 20 21 14 7
Feb 15 36 19 17
Mar 21 70 47 23
Apr 12 100 40 60
May 17 122 67 55
Jun 21 116 81 35
Jul 11 120 43 77
Aug 0 104 0 104
Sep 20 78 52 26
Oct 17 47 26 21
Nov 21 26 18 8
Dec 15 18 9 9
Year 190 858 416 442
Each bar is one month's output per kWp, divided at the school gate. The May bar is 6.8 times the December one and the timetable runs the other way round. We apportion a month's generation evenly over its days, having no half hourly data for your meter. Session days follow a typical English school year of 190 days. Your own trust or authority may differ by a few days either way. Source: EU PVGIS v5.2, session days from a typical school calendar

East Riding of Yorkshire schools, phase by phase

East Riding of Yorkshire has 150 open state-funded schools and colleges on the DfE register teaching 44,348 pupils between them. Source: DfE Get Information About Schools.

The split is 128 primary, 18 secondary, 3 special and 1 further education, at an average of 296 pupils a site. At 7.1 primaries to every secondary, most of the buildings here are small. That is not a reason to skip them, but it does mean the usable area on a primary is a hall roof and a teaching block rather than an estate.

For a trust with more than one site in East Riding of Yorkshire, the first survey is worth running across the whole estate. It tells you which roofs are near the end of their covering life, which have the switchboard headroom, and therefore which one should carry the first array.

Aerial view of a school site with teaching blocks of several different ages, a sports hall and a playing field, solar arrays on two of the flat roofs
A school site with blocks of several ages, which is the usual starting point for a trust estate survey.

Grid connection through Northern Powergrid

Northern Powergrid is the network operator here, and their answer on export capacity shapes the design. Any commercial array above 3.68 kW per phase connects under G99 rather than G98, and the application fixes what you are allowed to push back onto the network. If the local network is tight, limiting export rarely breaks the case here: most of the generation is consumed on site while the building is working.

Across East Riding of Yorkshire the planning database records 86 solar schemes totalling 1439 MW, of which 2 are operational (REPD Q1 2026).

Book the survey

Book a roof survey at your Goole school

Lenzie Consulting Ltd arranges roof surveys for schools across East Riding of Yorkshire. Send the school postcode and a rough idea of the roof area, and the last twelve months of half hourly meter data if the school holds it. We come back with what the roofs can carry, what they would generate against your own consumption, and the funding routes open to a school.

Lenzie Consulting Ltd arranges the survey and passes your details to an MCS-certified installation partner so they can quote. We do not carry out the installation ourselves.

We pass your details to our MCS-certified installation partner so they can quote. Read the privacy notice.

Goole school solar, answered

What would a 440 kWp array produce at a Goole school?
Yes, and the figure matters more than the sunshine. 858 kWh per kWp a year puts a 440 kWp array at around 377,500 kWh, on roughly 1,307 square metres of roof. The value of that depends on your term time load. Source: EU PVGIS v5.2, SARAH3, 10 degree pitch, 14 percent system loss.
What happens to the electricity during the summer holidays in Goole?
Less is wasted than governors expect, but the figure is worth seeing: 26.1 percent of the year is modelled to arrive in July and August here (EU PVGIS v5.2), against a site running on holiday base load. Lettings, holiday clubs and summer works take some of it, storage takes more, and the rest is an export question for Northern Powergrid.
Who do we apply to for export near Goole?
Only Northern Powergrid can answer it for your connection. What we can say is that a capped export limit rarely breaks a school scheme, because the array that suits a school is sized to the term time load rather than to the roof.
Do we need planning permission in East Riding of Yorkshire?
Often not, because panels on the roof of a school building usually sit within permitted development for non-domestic buildings. The exceptions are listed buildings, conservation areas and arrays that project too far above the roof plane, and larger schemes still need prior approval from East Riding of Yorkshire. We confirm it either way.
How many schools are there around Goole?
East Riding of Yorkshire has 150 open state-funded schools and colleges on the DfE register, with 44,348 pupils on roll. Source: DfE Get Information About Schools. We survey across the whole of that area, and where a trust holds several sites we look at them in one pass.